My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-04-07 Agenda Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
1999
>
1999-04-07 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2010 9:49:38 AM
Creation date
4/28/2010 9:49:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. March further explained that in options two and three, the city would still be looking <br /> at some expenses in regards to what we would do with the current public works facility <br /> and the downtown area. One idea was to save one of the buildings for a heritage museurn <br /> and possibly demolish the other building. There would be a cost involved in regards to <br /> ongoing operation and maintenance. Another issue would be deciding who would be <br /> responsible for the utilities. <br /> O�tion #4: Cedar Street Park <br /> Advantages: City owns the land <br /> We could build exactly what we want <br /> Few residential neighbors #o worry about <br /> Disadvantages: Cost for building and utilities <br /> Isolated location <br /> More valuable to sell as industriat <br /> Mayor V�ilharber asked the Council if there was any of the four options that they would <br /> like to throw out right now or if they would like to continue to look at a11 four options. <br /> Councilmember Travis stated that he had some concerns about the size and the future use �� <br /> of the building. Councilmember Travis also questioned whether the Cedar Street location '� <br /> could be used as a dual purpose. The City has talked about a possible salt storage with <br /> the County, as well as obtaining a second water tower. In order to incorporate these <br /> items, Councilmember Travis stated that he was thinking about an office-warehouse type <br /> building, basically a slab on grade where you don't have to worry about ADA and there <br /> would be bathrooms, and offices for the police. Councilmember Travis continued, stating <br /> the he was looking more for a building that would be like a pole-barn with a house at the <br /> end of it. Mr. March commented that previously he was involved in a similar project and ' <br /> at that time, building construction was $65 a square foot. Mr. Palzer added that now we <br /> are looking at about $100 per square foot for 6000 square feet, and that we need to keep <br /> in mind that this facility will be around for the ne� 80 to 100 years. Mr. March indicated <br /> that the City of Circle Pines just built a fire department about that size and that it cost <br /> $995,000 and that was without showers. Due to the cost and comple�ty of this option, it <br /> was dropped as a possible location for the new Public Works building. Councilmember <br /> Nelson suggested that we would be better off as a City to sell this property then to build <br /> on it because we could actually make some money. <br /> The Council continued by discussing option # 1 and decided that it should be thrown out <br /> due to the disadvantages listed and it being an eyesore to the downtown area. <br /> After a lengthy discussion between options #2 and #3, the Council decided that the Lake <br /> Area Utilities location would be the most favarable option. The reasons for the decision <br /> include the following: less cost, growth possibilities, not primarily residential, obtain <br /> possession this fa11, additional income from rentals currently leasing, more square footage, <br /> and additional land available for a possible second water tower. Mr. March indicated that <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.