Laserfiche WebLink
Bonestr'oo, Rosene, Ande�lik and Associates, Inc. is an Affirmative Action/Equal Opportunity Employer <br /> B onestroo Principals Otto G Bonestroo, PE • Joseph C Anderlik, f?E • Marvin L Sorvaia, PE. • <br /> Richard E. Turner, f'.E. • Glenn R. Cook, P,E, • Robert G. Schunich[, P.E. • Jerry A. Bourdon, P.E. • <br /> Rosene Rober[ W Rosene, PE and Susan M. Eberlin, CPA, Senior ConsWtan[s <br /> � Anderlik & Associate Principals Howzrd A Sanfortl, f'E • Keith A. Gordon, PE • Robert R Pfefferle, PE • <br /> Richard W. Foster, 1.E. • David O. Loskota, P.E. • Robert C. Russek. A.I.A, • Mark A. Nanson, P.E • <br /> , Michael T. Rau[mann, P.E. • 7ed K.Fieid, PE. � Kerneth f'. Anderson, P.E. • Mark R. Rolfs, P.E. • <br /> A ssociates Sidney P. Williamson, I�E, LS • Robert F Kotsmith • Agnes M Ring • Michael P Rau, f E. • <br /> Allan Rick Schmidt, P.E. <br /> Engineers & Architects Offires: Si. Paul, Rochester, Willmar and S[ Cloud, MN • Milwaukee, WI <br /> Website.� www_bonestroo.com <br /> MEMO <br /> TO: Jim March <br /> City of Centen�lle Administrator <br /> FROM: Tom Peterson �� <br /> . City Engineer , <br /> DATE: February 19, 1999 <br /> SUBJECT: Lai�lotte Park Bituminous Trail Cost Estimate I <br /> Our File No. 616-98-804 ��� <br /> In regards to a proposed trail through Laurie Lal�lotte Park, I have prepared a cost estimate for � <br /> your use in obtaining Qrant money. <br /> Per you directions, the trail ti� start at the soutt��west corner of the property, eYtend north to <br /> the south side of the parking lot, turn east and weave between the three softball fields, continue <br /> east to Centerville Road, and proceed north about 300 feet to the north right-of-way line of <br /> �Ieado�v Lane. The total len�th of the trailway system is 2300 feet. � <br /> The ty�pical section for the trail �rould be: '� <br /> 8' �vide Bituminous « course 2" thick I I <br /> , <br /> 10' �vide Class � ag� base, 6" thick <br /> The estimated costs for overall project are as folloti��s_ <br /> �70 C1' Common excavation @ SS.tJO/cy 52,8�0 <br /> 930 Ton Ctass � ag�regate @ 510.QO1Ton 9,300 <br /> 2�0 Ton Bituminous tivear course @�3�.00/Ton 8,7�0 <br /> 1?0 CY" Topsoit borrow @�1Q.00/cy 1.200 <br /> Subtotal Construction 522,100 <br /> — 10% Contingencies �.�00 <br /> Total Construction �?�1,300 <br /> — 30% Indirect Costs 7.300 <br /> TOTAL PROJECT �31,600 <br /> The total project cost of �31,600 is equivalent to �I3.74 per tineat foot of trail. <br /> If you have any questions or need additional information, my number is 651-60-�-4�65. <br /> 2335 West Highw�y 3G ■ St. Paul, MN 551]3 ■ G51-G3G-4G00 ■ F�x: G51-G3G-131] <br />