Bonestr'oo, Rosene, Ande�lik and Associates, Inc. is an Affirmative Action/Equal Opportunity Employer
<br /> B onestroo Principals Otto G Bonestroo, PE • Joseph C Anderlik, f?E • Marvin L Sorvaia, PE. •
<br /> Richard E. Turner, f'.E. • Glenn R. Cook, P,E, • Robert G. Schunich[, P.E. • Jerry A. Bourdon, P.E. •
<br /> Rosene Rober[ W Rosene, PE and Susan M. Eberlin, CPA, Senior ConsWtan[s
<br /> � Anderlik & Associate Principals Howzrd A Sanfortl, f'E • Keith A. Gordon, PE • Robert R Pfefferle, PE •
<br /> Richard W. Foster, 1.E. • David O. Loskota, P.E. • Robert C. Russek. A.I.A, • Mark A. Nanson, P.E •
<br /> , Michael T. Rau[mann, P.E. • 7ed K.Fieid, PE. � Kerneth f'. Anderson, P.E. • Mark R. Rolfs, P.E. •
<br /> A ssociates Sidney P. Williamson, I�E, LS • Robert F Kotsmith • Agnes M Ring • Michael P Rau, f E. •
<br /> Allan Rick Schmidt, P.E.
<br /> Engineers & Architects Offires: Si. Paul, Rochester, Willmar and S[ Cloud, MN • Milwaukee, WI
<br /> Website.� www_bonestroo.com
<br /> MEMO
<br /> TO: Jim March
<br /> City of Centen�lle Administrator
<br /> FROM: Tom Peterson ��
<br /> . City Engineer ,
<br /> DATE: February 19, 1999
<br /> SUBJECT: Lai�lotte Park Bituminous Trail Cost Estimate I
<br /> Our File No. 616-98-804 ���
<br /> In regards to a proposed trail through Laurie Lal�lotte Park, I have prepared a cost estimate for �
<br /> your use in obtaining Qrant money.
<br /> Per you directions, the trail ti� start at the soutt��west corner of the property, eYtend north to
<br /> the south side of the parking lot, turn east and weave between the three softball fields, continue
<br /> east to Centerville Road, and proceed north about 300 feet to the north right-of-way line of
<br /> �Ieado�v Lane. The total len�th of the trailway system is 2300 feet. �
<br /> The ty�pical section for the trail �rould be: '�
<br /> 8' �vide Bituminous « course 2" thick I I
<br /> ,
<br /> 10' �vide Class � ag� base, 6" thick
<br /> The estimated costs for overall project are as folloti��s_
<br /> �70 C1' Common excavation @ SS.tJO/cy 52,8�0
<br /> 930 Ton Ctass � ag�regate @ 510.QO1Ton 9,300
<br /> 2�0 Ton Bituminous tivear course @�3�.00/Ton 8,7�0
<br /> 1?0 CY" Topsoit borrow @�1Q.00/cy 1.200
<br /> Subtotal Construction 522,100
<br /> — 10% Contingencies �.�00
<br /> Total Construction �?�1,300
<br /> — 30% Indirect Costs 7.300
<br /> TOTAL PROJECT �31,600
<br /> The total project cost of �31,600 is equivalent to �I3.74 per tineat foot of trail.