My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-11 Packet
Centerville
>
Planning & Zoning
>
Agenda Packets
>
1994-2022
>
2010
>
2010-05-11 Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2010 2:10:26 PM
Creation date
5/7/2010 2:10:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(5) The architectural design and exterior building materials used in connection <br /> with any new or expanded use or structure shall be consistent with any architectural � <br /> design or aesthetic control requirements established by the Redevelopment Plan. The Ciry <br /> will engage the services of a consultant architect to assist with the review. The cost of <br /> such services may be charged to the applicant. <br /> (6) Stormwater management will be accomplished through regional stormwater <br /> facilities. Conshuction of the stormwater facilities may be accomplished through <br /> ' coordinated private improvements and public improvements, and maintenance of the <br /> ' stormwater facilities may be accomplished through district-wide assessments and user <br /> fees. Individual stormwater improvements that are not part of the planned regional � <br /> stormwater management facilities are notpermitted in the M-1 District. � <br /> �I <br />
The URL can be used to link to this page
Your browser does not support the video tag.