Laserfiche WebLink
3.1.2 Notwithstanding the provisions of 3.1.1, for Construction Engineering Basic Services, the <br />Engineer's actual costs may be more or less than its initial estimate, based on a level of effort <br />that must vary to account for such unknown Project factors as: <br />• Quality and responsiveness of the construction contractor(s) <br />• Weather conditions <br />• Adherence to the Project construction schedule <br />• Unknown or changed conditions at the Project site revealed during construction <br />The Consultant will not provide services nor incur expenses which would cause its charges to <br />exceed its estimate without the City's authorization. <br />3.1.3 As an alternative for a particular Project if agreed to by both parties, the City may pay the <br />Consultant on a lump sum basis where the amount is negotiated between the two parties. <br />3.2 Pavment for Reimbursable Expenses <br />3.3 Unless otherwise provided, in addition to Engineer's fees, the City will pay the Consultant for <br />Reimbursable Expenses on the basis of the Engineer's cost plus 10 %. Although not a complete list, <br />examples of Reimbursable Expenses include: the costs of plotting drawings and the reproduction of <br />drawings and specifications; project- specific printing and binding; rental equipment; testing; <br />mileage; travel and per -diem expenses of the Consultant for out -of -town trips required for the <br />Project; construction stakes; postage and delivery charges; any new taxes, fees or costs imposed <br />on the Engineer's services (such as sales taxes) after the date of this Agreement; and <br />out -of- pocket expenses incurred directly for the Project. <br />3.4 Proaress Pavments <br />The City will make progress payments to the Consultant in proportion to services performed and <br />expenses incurred. The Consultant will invoice the City by email or first -class mail monthly during <br />the progress of the work. The City shall pay each properly documented invoice of the Consultant <br />within 30 days after the City's receipt of such invoice. The City may not reserve as retainage any <br />portion of a payment due under this Agreement. <br />3.5 Obiections to Invoices /No Deductions <br />It is important for the Consultant to be promptly informed of problems. If the City objects to any <br />portion of an invoice, the City shall notify the Consultant in writing within twenty days of the <br />invoice's receipt. The City agrees to pay any undisputed portions of an invoice. No deductions shall <br />be made from the Engineer's compensation on account of penalty, liquidated damages, or other <br />sums withheld from payment to contractors, except as may be determined by mediation, <br />arbitration, litigation or other dispute resolution mechanism to which the Consultant is a party. <br />3.6 Suspension of Work <br />If the City fails to make payments when due or otherwise breaches this Agreement, the Consultant <br />may suspend work after providing five days notice to the City. The Consultant will not be liable for <br />any costs or damages resulting from such a suspension of work. <br />3.7 Interest/Collection Costs <br />The City agrees to pay the Consultant 1% per month interest on all invoices of the Consultant <br />which are not in dispute, with interest beginning to accrue 30 days after the date of the invoice. If <br />the Minnesota Prompt Payment Act (Minn. Stat. §471.425) requires a higher rate of interest, that <br />rate shall apply. If the City fails to pay Consultant all amounts owing pursuant to the terms of this <br />Agreement, the City agrees to pay all costs of collection, including reasonable attorney's fees, in <br />addition to all other amounts due under this Agreement. <br />SECTION 4. GENERAL CONSIDERATIONS <br />4.1 Standard of Care <br />Centerville City Engineer Master Agreement <br />24 <br />