My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-07 P & R Agenda Packet
Centerville
>
Committees
>
Parks & Rec.
>
Agenda Packets
>
1997-2022
>
2010
>
2010-07-07 P & R Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2010 10:05:58 AM
Creation date
7/6/2010 10:05:55 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to allow drainage from the south side. I was envisioning a 50 foot set back from the property lines for <br /> limited impact upon these home owners. Let me know if I can assist with anything else. <br /> Chairperson Branch: <br /> We talked about the depth of the pea gravel and where to tie the drain title. We talked about both of the <br /> options but without more design specifics it did not figure into the estimate. I think for the preliminary <br /> estimate we are in the right ball park. What the committee needs to focus on is how bad do we want this <br /> volley ball court and is there actually a chance of funding it? <br /> Mr. Palzer's input tells me that we are a little high on the fabric, but under estimating the pea rock and <br /> drainage title. But, the estimate is still close enough. <br />
The URL can be used to link to this page
Your browser does not support the video tag.