81608147 -0REQ6F= ids
<br />13
<br />Contract
<br />Unit
<br />Current
<br />Quantity
<br />Amount
<br />No, Item
<br />Unit
<br />Quantity
<br />Price
<br />Quantity
<br />to Date
<br />to Date
<br />PART 1 -SITE GRADING;
<br />1
<br />MOBILIZATION
<br />LS
<br />1
<br />6000.00
<br />1
<br />$6,00000
<br />2
<br />TRAFFIC CONTROL
<br />LS
<br />1
<br />100000
<br />1
<br />$1,000.00
<br />3
<br />DEWATERING
<br />LS
<br />1
<br />1.00
<br />1
<br />$100
<br />4
<br />TEMPORARY ROCK CONSTRUCTION ENTRANCE
<br />TN
<br />75
<br />20.00
<br />8153
<br />$1,630.60
<br />5
<br />REMOVE BITUMINOUS PAVEMENT
<br />SY
<br />2500
<br />1.00
<br />2500
<br />$2,50000
<br />6
<br />REMOVE CONCRETE CURB AND GUTTER
<br />LF
<br />215
<br />4.00
<br />163
<br />$652.00
<br />7
<br />REMOVE LANDSCAPE WOOD BARRIER,
<br />LS
<br />1
<br />500.00
<br />1
<br />$500.00
<br />8
<br />REMOVE RCP CULVERT
<br />LF
<br />60
<br />4.00
<br />32
<br />$128.00
<br />9
<br />REMOVE CMP CULVERT
<br />LF
<br />60
<br />2.00
<br />43
<br />$86,00
<br />10
<br />REMOVE SANITARY SEWER PIPE
<br />LF
<br />25
<br />5.00
<br />$0.00
<br />11
<br />SALVAGE AND REINSTALL EXISTING CMP CULVERT
<br />LF
<br />45
<br />5.55
<br />23
<br />$127.65
<br />12
<br />SALVAGE AND REINSTALL MAILBOX
<br />EA
<br />4
<br />100.00
<br />4
<br />$40000
<br />13
<br />SALVAGE, STOCKPILE, AND REINSTALL AGGREGATE BASE
<br />CY
<br />350
<br />4.50
<br />320
<br />$1,440.00
<br />14
<br />SALVAGE, STOCKPILE, AND RESPREAD EXISTING TOPSOIL
<br />LS
<br />1
<br />3300.00
<br />1
<br />$3,300.00
<br />15
<br />SILT FENCE, MACHINE SLICED
<br />LF
<br />500
<br />1.40
<br />10
<br />$14.00
<br />16
<br />CLEAR AND GRUB
<br />LS
<br />1
<br />1500.00
<br />1
<br />$1,500.00
<br />17
<br />COMMON EXCAVATION (EV)
<br />CY
<br />3890
<br />400
<br />3885
<br />$15,540.00
<br />18
<br />SUBGRADE EXCAVATION (EV)
<br />CY
<br />1000
<br />4.00
<br />944
<br />$3,776.00
<br />19
<br />TOPSOIL BORROW (LV)
<br />CY
<br />250
<br />12.00
<br />71
<br />71
<br />$852.00
<br />20
<br />PROTECTION OF C8 IN STREET - FURNISH AND INSTALL WIMCO
<br />EA
<br />5
<br />195.00
<br />5
<br />$975.00
<br />21
<br />SODDING, LAWN TYPE
<br />SY
<br />915
<br />4.00
<br />133
<br />$532.00
<br />22
<br />SEEDING, INCI MNDOT SEED MIX 270, FERTILIZER, MULCH, AND
<br />DISK ANCHOR
<br />AC
<br />1
<br />1500.00
<br />0.15
<br />2.52
<br />$3,780.00
<br />TOTAL PART 1 -SITE GRADING:
<br />$44,734.25
<br />PART 2 - SANITARY SEWER:
<br />23
<br />CONNECT TO EXISTING SANITARY SEWER MANHOLE
<br />EA
<br />1
<br />400.00
<br />1
<br />$400.00
<br />24
<br />8" PVC SANITARY SEWER, SDR 35, ALL DEPTHS
<br />LF
<br />699
<br />19.00
<br />690
<br />$13,110.00
<br />15
<br />4' DIA SANITARY MH, INCL R -1733 CSTG, AND CONC ADJ
<br />RINGS
<br />EA
<br />3
<br />1800.00
<br />3
<br />$5,400.00
<br />26
<br />4' DIAMETER SANITARY MANHOLE OVERDEPTH
<br />LF
<br />19
<br />150.00
<br />14
<br />$2,10000
<br />27
<br />8" X 4" PVC WYE, SDR 35
<br />EA
<br />5
<br />55.00
<br />6
<br />$330.00
<br />28
<br />10" X 4" SADDLE WYE, SDR 35
<br />EA
<br />1
<br />75.00
<br />1
<br />$75.00
<br />29
<br />8" PVC PLUG
<br />EA
<br />3
<br />50.00
<br />3
<br />$150.00
<br />30
<br />IMPROVED PIPE FOUNDATION
<br />LF
<br />699
<br />2.00
<br />770
<br />$1,540.00
<br />31
<br />CLOSED CIRCUIT TV INSPECTION
<br />LF
<br />699
<br />1.00
<br />792
<br />$792.00
<br />TOTAL PART 2 - SANITARY SEWER:
<br />$23,897.00
<br />PART 3 - WATER MAIN:
<br />32
<br />CONNECT TO EXISTING 8" WATER MAIN
<br />EA
<br />1
<br />400.00
<br />1
<br />$400.00
<br />33
<br />8" PVC C900 WATER MAIN
<br />LF
<br />660
<br />2400
<br />654
<br />$15,696,00
<br />34
<br />6" PVC C900 WATER MAIN
<br />LF
<br />35
<br />21.00
<br />64
<br />$1,34400
<br />35
<br />8" GATE VALVE AND BOX
<br />EA
<br />1
<br />1250.00
<br />1
<br />$1,25000
<br />36
<br />HYDRANT WITH VALVE
<br />EA
<br />2
<br />3100.00
<br />2
<br />$6,200.00
<br />37
<br />DUCTILE IRON FITTINGS
<br />LB
<br />1400
<br />2.50
<br />1172
<br />$2,930.00
<br />38
<br />IMPROVED PIPE FOUNDATION
<br />LF
<br />695
<br />200
<br />300
<br />$600.00
<br />TOTAL PART 3 - WATER MAIN:
<br />$28,410.00
<br />PART 4 - SERVICES:
<br />39
<br />1 " CORPORATION STOP WITH 8" SADDLE
<br />EA
<br />6
<br />125.00
<br />7
<br />$87500
<br />40
<br />1 " CURB STOP AND BOX
<br />"K"
<br />EA
<br />6
<br />145.00
<br />7
<br />$1,01500
<br />41
<br />1" TYPE COPPER WATER SERVICE
<br />LF
<br />320
<br />17.00
<br />370
<br />$6,29000
<br />42
<br />4" PVC, SCH. 40 SERVICE PIPE
<br />LF
<br />170
<br />1600
<br />352
<br />$5,632.00
<br />43
<br />IMPROVED PIPE FOUNDATION
<br />LF
<br />300
<br />200
<br />$0.00
<br />44
<br />INSULATION, 4" THICK
<br />SY
<br />25
<br />2600
<br />18
<br />$468.00
<br />TOTAL PART 4 - SERVICES:
<br />$14,28000
<br />81608147 -0REQ6F= ids
<br />13
<br />
|