Laserfiche WebLink
81608147 -0REQ6F= ids <br />13 <br />Contract <br />Unit <br />Current <br />Quantity <br />Amount <br />No, Item <br />Unit <br />Quantity <br />Price <br />Quantity <br />to Date <br />to Date <br />PART 1 -SITE GRADING; <br />1 <br />MOBILIZATION <br />LS <br />1 <br />6000.00 <br />1 <br />$6,00000 <br />2 <br />TRAFFIC CONTROL <br />LS <br />1 <br />100000 <br />1 <br />$1,000.00 <br />3 <br />DEWATERING <br />LS <br />1 <br />1.00 <br />1 <br />$100 <br />4 <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />TN <br />75 <br />20.00 <br />8153 <br />$1,630.60 <br />5 <br />REMOVE BITUMINOUS PAVEMENT <br />SY <br />2500 <br />1.00 <br />2500 <br />$2,50000 <br />6 <br />REMOVE CONCRETE CURB AND GUTTER <br />LF <br />215 <br />4.00 <br />163 <br />$652.00 <br />7 <br />REMOVE LANDSCAPE WOOD BARRIER, <br />LS <br />1 <br />500.00 <br />1 <br />$500.00 <br />8 <br />REMOVE RCP CULVERT <br />LF <br />60 <br />4.00 <br />32 <br />$128.00 <br />9 <br />REMOVE CMP CULVERT <br />LF <br />60 <br />2.00 <br />43 <br />$86,00 <br />10 <br />REMOVE SANITARY SEWER PIPE <br />LF <br />25 <br />5.00 <br />$0.00 <br />11 <br />SALVAGE AND REINSTALL EXISTING CMP CULVERT <br />LF <br />45 <br />5.55 <br />23 <br />$127.65 <br />12 <br />SALVAGE AND REINSTALL MAILBOX <br />EA <br />4 <br />100.00 <br />4 <br />$40000 <br />13 <br />SALVAGE, STOCKPILE, AND REINSTALL AGGREGATE BASE <br />CY <br />350 <br />4.50 <br />320 <br />$1,440.00 <br />14 <br />SALVAGE, STOCKPILE, AND RESPREAD EXISTING TOPSOIL <br />LS <br />1 <br />3300.00 <br />1 <br />$3,300.00 <br />15 <br />SILT FENCE, MACHINE SLICED <br />LF <br />500 <br />1.40 <br />10 <br />$14.00 <br />16 <br />CLEAR AND GRUB <br />LS <br />1 <br />1500.00 <br />1 <br />$1,500.00 <br />17 <br />COMMON EXCAVATION (EV) <br />CY <br />3890 <br />400 <br />3885 <br />$15,540.00 <br />18 <br />SUBGRADE EXCAVATION (EV) <br />CY <br />1000 <br />4.00 <br />944 <br />$3,776.00 <br />19 <br />TOPSOIL BORROW (LV) <br />CY <br />250 <br />12.00 <br />71 <br />71 <br />$852.00 <br />20 <br />PROTECTION OF C8 IN STREET - FURNISH AND INSTALL WIMCO <br />EA <br />5 <br />195.00 <br />5 <br />$975.00 <br />21 <br />SODDING, LAWN TYPE <br />SY <br />915 <br />4.00 <br />133 <br />$532.00 <br />22 <br />SEEDING, INCI MNDOT SEED MIX 270, FERTILIZER, MULCH, AND <br />DISK ANCHOR <br />AC <br />1 <br />1500.00 <br />0.15 <br />2.52 <br />$3,780.00 <br />TOTAL PART 1 -SITE GRADING: <br />$44,734.25 <br />PART 2 - SANITARY SEWER: <br />23 <br />CONNECT TO EXISTING SANITARY SEWER MANHOLE <br />EA <br />1 <br />400.00 <br />1 <br />$400.00 <br />24 <br />8" PVC SANITARY SEWER, SDR 35, ALL DEPTHS <br />LF <br />699 <br />19.00 <br />690 <br />$13,110.00 <br />15 <br />4' DIA SANITARY MH, INCL R -1733 CSTG, AND CONC ADJ <br />RINGS <br />EA <br />3 <br />1800.00 <br />3 <br />$5,400.00 <br />26 <br />4' DIAMETER SANITARY MANHOLE OVERDEPTH <br />LF <br />19 <br />150.00 <br />14 <br />$2,10000 <br />27 <br />8" X 4" PVC WYE, SDR 35 <br />EA <br />5 <br />55.00 <br />6 <br />$330.00 <br />28 <br />10" X 4" SADDLE WYE, SDR 35 <br />EA <br />1 <br />75.00 <br />1 <br />$75.00 <br />29 <br />8" PVC PLUG <br />EA <br />3 <br />50.00 <br />3 <br />$150.00 <br />30 <br />IMPROVED PIPE FOUNDATION <br />LF <br />699 <br />2.00 <br />770 <br />$1,540.00 <br />31 <br />CLOSED CIRCUIT TV INSPECTION <br />LF <br />699 <br />1.00 <br />792 <br />$792.00 <br />TOTAL PART 2 - SANITARY SEWER: <br />$23,897.00 <br />PART 3 - WATER MAIN: <br />32 <br />CONNECT TO EXISTING 8" WATER MAIN <br />EA <br />1 <br />400.00 <br />1 <br />$400.00 <br />33 <br />8" PVC C900 WATER MAIN <br />LF <br />660 <br />2400 <br />654 <br />$15,696,00 <br />34 <br />6" PVC C900 WATER MAIN <br />LF <br />35 <br />21.00 <br />64 <br />$1,34400 <br />35 <br />8" GATE VALVE AND BOX <br />EA <br />1 <br />1250.00 <br />1 <br />$1,25000 <br />36 <br />HYDRANT WITH VALVE <br />EA <br />2 <br />3100.00 <br />2 <br />$6,200.00 <br />37 <br />DUCTILE IRON FITTINGS <br />LB <br />1400 <br />2.50 <br />1172 <br />$2,930.00 <br />38 <br />IMPROVED PIPE FOUNDATION <br />LF <br />695 <br />200 <br />300 <br />$600.00 <br />TOTAL PART 3 - WATER MAIN: <br />$28,410.00 <br />PART 4 - SERVICES: <br />39 <br />1 " CORPORATION STOP WITH 8" SADDLE <br />EA <br />6 <br />125.00 <br />7 <br />$87500 <br />40 <br />1 " CURB STOP AND BOX <br />"K" <br />EA <br />6 <br />145.00 <br />7 <br />$1,01500 <br />41 <br />1" TYPE COPPER WATER SERVICE <br />LF <br />320 <br />17.00 <br />370 <br />$6,29000 <br />42 <br />4" PVC, SCH. 40 SERVICE PIPE <br />LF <br />170 <br />1600 <br />352 <br />$5,632.00 <br />43 <br />IMPROVED PIPE FOUNDATION <br />LF <br />300 <br />200 <br />$0.00 <br />44 <br />INSULATION, 4" THICK <br />SY <br />25 <br />2600 <br />18 <br />$468.00 <br />TOTAL PART 4 - SERVICES: <br />$14,28000 <br />81608147 -0REQ6F= ids <br />13 <br />