Laserfiche WebLink
6160614 7.0REQ6flns1 ids <br />14 <br />Contract <br />Unit <br />Current <br />Quantity <br />Amount <br />No. PART 5 -STORM SEWER: Item <br />Unit <br />Quantity <br />Price <br />Quantity <br />to Date <br />to Date <br />45 CONNECT TO EXISTING CATCH BASIN <br />EA <br />1 <br />350.00 <br />1 <br />$350.00 <br />46 15" RCP STORM SEWER, CLASS 5 <br />LF <br />453 <br />26.00 <br />453 <br />$11,778.00 <br />47 24" RCP STORM SEWER, CLASS 3 <br />LF <br />232 <br />37.00 <br />233 <br />$8,621.00 <br />48 24" FLARED END SECTION, INCLUDING TRASH GUARD <br />EA <br />1 <br />1375.00 <br />1 <br />$1,375.00 <br />49 4' DIA STORM SEWER CBMH, INCL R- 3067 -VB CSTG, AND CONC <br />AN RINGS <br />EA <br />2 <br />1300.00 <br />2 <br />$2,600.00 <br />50 4' DIA STORM SEWER CBMH, INCL. R- 3067 -V CSTG, AND CONC <br />ADJ RINGS <br />EA <br />1 <br />1325.00 <br />1 <br />$1,325,00 <br />51 4' DIA STORM SEWER MH , INCL. R -1733 CSTG, AND CONC ADJ <br />RINGS <br />EA <br />1 <br />1500.00 <br />1 <br />$1,50000 <br />52 CLASS III RANDOM RIPRAP <br />CY <br />12 <br />55.00 <br />13 <br />$715.00 <br />53 IMPROVED PIPE FOUNDATION <br />LF <br />200 <br />2.00 <br />$000 <br />54 CLOSED CIRCUIT TV INSPECTION <br />LF <br />685 <br />1.00 <br />685 <br />$685.00 <br />TOTAL PART 5 - STORM SEWER: <br />$28,949,00 <br />PART 6 - STREETS: <br />55 SAWING BITUMINOUS PAVEMENT <br />LF <br />315 <br />2.00 <br />66 <br />245 <br />$490.00 <br />56 SUBGRADE PREPARATION - STREET <br />SY <br />3300 <br />0,50 <br />3200 <br />$1,600.00 <br />57 GEOTEXTILE FABRIC, TYPE V <br />SY <br />3300 <br />1.30 <br />3200 <br />$4,160.00 <br />58 SELECT GRANULAR BORROW (CV) <br />CY <br />2000 <br />9.50 <br />2381 <br />$22,619.50 <br />59 AGGREGATE BASE, CLASS 5 <br />TN <br />1570 <br />12.75 <br />1934 <br />$24,658.50 <br />60 TYPE LV 3 NON WEARING COURSE MIXTURE (B) <br />TN <br />380 <br />52.50 <br />364.2 <br />$19,120.50 <br />61 TYPE LV 3 WEARING COURSE MIXTURE (B) <br />TN <br />290 <br />58.25 <br />271.21 <br />321.59 <br />$18,732.62 <br />62 BITUMINOUS MATERIAL FOR TACK COAT <br />GAL <br />275 <br />2.00 <br />80 <br />120 <br />$240.00 <br />63 SURMOUNTABLE CONCRETE CURB AND GUTTER <br />LF <br />1470 <br />895 <br />1438 <br />$12,87010 <br />64 ADJUST EXISTING CATCH BASIN CASTING <br />EA <br />1 <br />12500 <br />1 <br />$125,00 <br />65 ADJUST EXISTING MANHOLE CASTING <br />EA <br />2 <br />175.00 <br />3 <br />$525.00 <br />66 4" PERFORATED POLYETHYLENE PIPE, WITH SOCK WRAP <br />LF <br />1500 <br />300 <br />1465 <br />$4,395.00 <br />67 STREET SWEEPER (PICKUP BROOM W /OPERATOR) <br />HR <br />5 <br />100,00 <br />4 <br />20 <br />$2,000.00 <br />TOTAL PART 6 - STREETS: <br />$111,53622 <br />ALTERNATE N0. 1 - POND AND WETLAND <br />CONSTRUCTION: <br />68 SILT FENCE, MACHINE SLICED <br />LF <br />1000 <br />200 <br />600 <br />$1,200.00 <br />69 CLEAR AND GRUB <br />LS <br />1 <br />500000 <br />1 <br />$5,000.00 <br />70 SALVAGE, STOCKPILE, AND RESPREAD EXISTING TOPSOIL <br />LS <br />1 <br />5500.00 <br />1 <br />$5,500.00 <br />71 COMMON EXCAVATION (EV) <br />CY <br />4600 <br />2.50 <br />4600 <br />$11,500.00 <br />72 TOPSOIL BORROW (LV) <br />CY <br />500 <br />12.00 <br />$0,00 <br />73 SOIL BLEND FILTRATION MEDIA <br />CY <br />150 <br />45.00 <br />150 <br />$6,750.00 <br />74 12" RCP STORM SEWER, CLASS 5 <br />LF <br />8 <br />35.00 <br />8 <br />$280.00 <br />75 12" RCP FLARED END SECTION, INCL TRASH GUARD <br />EA <br />2 <br />700.00 <br />2 <br />$1,400.00 <br />76 6" PERFORATED POLYETHYLENE PIPE, INCL. SOCK WRAP, <br />AGGREGATE, AND FABRIC <br />LF <br />110 <br />1200 <br />110 <br />$1,32000 <br />77 6" PVC SOLID COVER CLEAN OUT • PER DETAIL <br />EA <br />1 <br />200.00 <br />1 <br />$200.00 <br />78 EMERGENCY OVERFLOW SWALE WITH ENKAMAT <br />SY <br />15 <br />30.00 <br />$0.00 <br />79 CLASS II RANDOM RIPRAP <br />CY <br />75 <br />50.00 <br />84 <br />$4,200.00 <br />80 SEEDING, INCL. MNDOT SEED MIX 270, FERTILIZER, MULCH, AND <br />DISK ANCHOR <br />AC <br />1.2 <br />1200.00 <br />12 <br />$1,440.00 <br />81 MNDOT MIX W5 - WETLAND MITIGATION AREAS <br />AC <br />0.5 <br />5000.00 <br />0.5 <br />$2,500.00 <br />82 MNDOT MIX 328 - INFILTRATION AREAS <br />AC <br />0.15 <br />6500.00 <br />0.15 <br />$975.00 <br />83 EROSION CONTROL BLANKETS, CATEGORY 3 <br />SY <br />1150 <br />115 <br />1150 <br />$1,322 50 <br />84 MNDOT MIX 190 - TEMPORARY SEED FOR STOCKPILE <br />LS <br />1 <br />50000 <br />$000 <br />TOTAL ALTERNATE NO. 1 - POND AND WETLAND CONSTRUCTION: <br />S43,58750 <br />CHANGE ORDER NO.2 <br />1 INSTALLATION OF 12" STORM SEWER CULVERT <br />LS <br />1 <br />950.00 <br />1 <br />$95000 <br />TOTAL CHANGE ORDER NO 2 <br />$950.00 <br />6160614 7.0REQ6flns1 ids <br />14 <br />