Laserfiche WebLink
<br />lateral benefit assessment. <br />a. Front Footage Basis <br />Determine the total assessable front footage of all lots and <br />equivalent lot units receiving lateral benefit and divide the <br />project cost by the total of assessable front footage. Each <br />lot or equivalent lot unit assessment is equal to the total <br />assessable front footage per unit multiplied by the front <br />footage assessment rate. <br /> <br />3. Building Service <br />The assessment rate for each size of building service 3/4 inch to <br />6 inch shall be determined by adding all the costs associated with <br />each size of service and dividing by the total number of services <br />constructed. Each unit will be assessed at the determined rate <br />for each size and number of services installed. This will be <br />known as the building service assessment. <br /> <br />14 <br />