My WebLink
|
Help
|
About
|
Sign Out
Home
2009 05-19 CCP
GemLake
>
CITY COUNCIL
>
PACKETS
>
2000 - 2009
>
2009
>
2009 05-19 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2026 2:29:15 PM
Creation date
7/22/2019 11:00:29 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
Show annotations
View images
View plain text
9.8 Plans for Re -development of Single Lots or Small Subdivisions. An applicant shall follow the following <br />procedure when seeking approval for new building construction (not an addition or expansion to an existing <br />building) upon land which was developed at the timeof the application, either requires no subdivision or is <br />eligible for minor subdivision approval, and for which no new streets ate required Such applications should <br />be processed for a Zoning Compliance Permit administratively by. the Zoning Administrator unless the pro- <br />posal requires conditional use permit or variance approval. <br />9.8.1 Suggested Presentation. The plans for this type of development shall use the Building <br />Type templates at Figures .6 through 15, as allowed by the. sub -zone in which the property lies. <br />Plans shouldintroduce new lot.. lines, :if any, and then depict the placement and disposition of the <br />proposed buildingtype for each lot. <br />9.8.2 Required.Subrnissions. The. applicant shall submit four (4) sets of the application materials <br />listed in 9.7.2. The %oningAdministrator may allow the:applicant to omit certain items if.it is clear <br />that•they are not applicable to the overall proposal. In all •circumstances,. the proposal shall•include <br />the elements required for •review under Sections •9.7:5 •Q3uilding Type) and 9.7.6 (Design).: <br />98:3 Connectivity requirements. While improvements to an existing roadway are: not required, <br />plans under. this subsection must indicate how the proposed construction would relate. to the road- <br />way if it •were reconstructed in accordance`with the requirements of Section 9.7.3. Proposals. under <br />this Section 9.8 involving more • than one• lot shall comply with • Section .9.7.3 (C).. Single -la t propos- <br />als must indicate design incorporating the requirements of 9.7.3(C), but only must • build .the im- <br />proveinents•. when the adjacent lots on..the same side of the right-of-way also .have built such im- <br />provements or have been approved for construction under..this. Section. <br />9.8.4 Evaluation of Incentives. Any incentives •created• by the City Council and in effect at the <br />time of. development application may besought by the applicant. The incentive items and allow- <br />ances, and their effect on the overall. development plan; ..shall be approved :by the City • Council,. <br />u nless specifically delegated within the .ordinance creating the applicable incentive. The request for <br />incentive approval does. not require City Council.. approval of the. entire plan. The Zoning.Adminis- <br />trator shall confer with at least one City consultant,: as directed by ordinance or at the•Administra- <br />tor's best discretion, in :order to evaluate .the proposed incentives •and.. make recommendations. to. <br />the approving. authority. If incentives• are apph.ed• for, the`applicant:and.:Zoning.Administrator.shall <br />✓ each agreement on the•.application of incentives prior to.;submitting the application. to. the Planning <br />Commission. If any .applied -for incentives ate recommended for rejection, the applicant may elect <br />to re -submit portions of the plans to incorporate the recommendation without incurring new appli- <br />cation fees;•the applicant electing to re -submit plans shall submit a written statement agreeing to an. <br />.extension of applicable timelines under Minn.: Stat. § 15.99, Minn.: Stat. § 462.358; and other appli- <br />cable laws ',and:ordinances.. The extension request shall be indefinite;: the •City shall process the re- <br />submitted materials within the timelines specified by law, treating.the date of re -submission as the <br />first day of any applicable • time period. <br />9.8.5 Administtative Approval. If the application satisfies all applicable criteria, the Zoning Ad- <br />ministrator shall approve the Zoning Compliance Permit. The applicant shall execute a Develop- <br />ment Agreement with the City prior to the receipt of any building permit under the plan. <br />Gem Luke.. Gaten'a y Distriit Deinelopm nt :Code <br />Maj 19, 2009 - Page 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.