My WebLink
|
Help
|
About
|
Sign Out
Home
2011 11-15 CCP
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2011
>
2011 11-15 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2026 11:30:05 AM
Creation date
7/29/2019 8:26:01 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
Show annotations
View images
View plain text
City of Gem Lake, Minnesota <br />2012 Fee Schedule <br />Soil Erosion Control <br />Inspection $200.00 - issued with each building permit with' <br />activity that disturbs over 1 acre of property <br />Relocation of Dwelling <br />Permit $1,000.00 <br />Demolition Permit <br />Residential $250.00 <br />Commercial $700.00 <br />Driveway Permit $50.00 <br />Fence Permit $50.00 <br />Sign Permit. <br />Commercial Temporary Signs $50.00 per sign for 60 days <br />New Permanent Sign $300.00 <br />Lighting or Electronic Sign $500.00 <br />Comprehensive Sign Plan $500.00 <br />Relocation of Sign $100.00 per sign <br />Grading and Filling Permits The fees for each review shall be based on <br />Table 2-A. Permit fees shall be based on Table <br />2-2-B. <br />TABLE 2A - GRADING PLAN REVIEW FEES <br />50 cubic yards (38.2 m3) or less $ 50.00 <br />51 to 100 cubic yards (40 m3 to 76.5 m3) $ 75.00 <br />101 to 1,000 cubic yards (77.2 m3 to 764.6 m5-) $100.00 <br />1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) $ 200.00 <br />10,001 to 100,000 cubic yards (7646.3 m3 to 76 455 m3) $200.00 for the first <br />10,000 cubic yards (7645.5 m3), plus $100.00 for each additional 10,000 yards <br />(7645.5 m3) or fraction thereof. _ <br />100,001 to 200,000 cubic yards (76 456 m3 to 152 911 m3) - $500.00 for the first <br />100,000 cubic yards (76 455 m3), plus $100.00 for each additional 10,000 cubic <br />yards (7645.5 m3) or fraction thereof. <br />200,001 cubic yards (152 912 m3) or more - $750.00 for the first 200,000 cubic <br />yards (152 911 m3), plus $100.00 for each additional 10,0.00 cubic yards (7645.5 <br />m3) or fraction thereof <br />Other Fees: <br />Additional plan review required by changes, additions or revisions <br />to approved plans (minimum charge - one-half hour) $ 100.00/hr <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.