My WebLink
|
Help
|
About
|
Sign Out
Home
2011 11-15 CCP
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2011
>
2011 11-15 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2026 11:30:05 AM
Creation date
7/29/2019 8:26:01 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
Show annotations
View images
View plain text
City of Gem Lake, Minnesota <br />2012 Fee Schedule <br />TABLE 2B -- GRADING PERMIT FEES1'2 <br />50 cubic yards (38.2 m) or less $ 75.00 <br />51 to 100 cubic yards (40 m3 to 76.5 m3) $100.00 <br />101 to 1,000 cubic yards (77.2 m3 to 764.6 m3) - $200.00 for the first 100 cubic <br />yards (76.5 m3) plus $17.50 for each additional 100 cubic yards (76.5 m3) or <br />fraction thereof. <br />1,001 to 10,000 cubic yards (765.3 m3 to 7645.5 m3) - $200.00 for the first 1,000 <br />cubic yards (764.6 m3), plus $100.00 for each additional 1,000 cubic yards (764.6 <br />m3) or fraction thereof. <br />10,001 to 100,000 cubic yards (7646.3 m to 76 455 m3) - $500.00 for the first <br />10,000 cubic yards (7645.5 m3), plus $100.00 for each additional 10,000 cubic <br />yards (7645.5 m3) or fraction thereof. <br />100,001 cubic yards (7645.6 ma) or more - $1,250.0.0 for the first 100,000 cubic <br />yards (7645.5 m3), plus $100.00 for each additional 10,000 cubic yards (7645.5 <br />m3) or fraction thereof. <br />Other Inspections and Fees: <br />1. Inspections outside of normal business hours $ 200.00/hr <br />(Minimum charge - two hours) <br />2. Re -inspection fees assessed $ 200.00/hr <br />3. Inspections for which no fee is specifically indicated $ 200.00/hr <br />(Minimum charge - two hours) <br />The fee for a grading permit authorizing additional work to be done under a valid permit <br />shall be the difference between the fee paid for the original permit and the fee shown for <br />the entire project,. <br />All grading and filling permits that will disturb greater than 1 acre of and will also be. <br />charged for a Soil Erosion permit. <br />Land. Miningj400 yards or more) <br />(All Land Mining that will disturb greater than 1 acre of land <br />will also be charged for a Soil Erosion Permit.). <br />Tree & Vegetation Permits <br />(when a building permit has <br />not been issued) <br />Burning Permit <br />Fire Inspections <br />Inspections Outside of <br />Normal Business Hours <br />$2,500.00 plus $3,000.00 <br />escrow for review <br />Per developmentlsubdivision <br />Escrow for review <br />Per building site <br />Escrow for review <br />No charge (Limit 1 per address) <br />$ 1,500.00 <br />$ 3,000.00 <br />$ 250.00 <br />$ 750.00 <br />$100.00 per unit (includes follow up) <br />$100.00. per hour (2 hour minimum) <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.