My WebLink
|
Help
|
About
|
Sign Out
Home
1994 05-16 CCP
GemLake
>
CITY COUNCIL
>
PACKETS
>
1990 - 1999
>
1994
>
1994 05-16 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2026 8:59:47 AM
Creation date
6/18/2019 2:49:41 PM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKET CITY COUNCIL
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
Show annotations
View images
View plain text
(a.) Such a lot or tract of land has been fully <br />assessed for the construction cost of the water system to which <br />the connection is made, or <br />(b) If no full assessment has been. levied for such <br />construction cost, the proceedings for levying such assessment <br />have been or will be completed in due course. <br />(2.) If the above conditions have not been met, no permit to <br />tap or connect to any water main shall be issued unless the <br />applicant shall pay an. .additional connection fee which shall be <br />equal to the portion of the construction cost of the said. water <br />system which would have been•assessable against said lot or tract <br />to be. served by such tapping connection, Said assessable cost <br />shall be determined. upon the. same basis as any:assessment <br />previously.levied against other property for the said water <br />system; including interest at the same rate of interest as <br />charged on the most recent City local impro.vement., which interest <br />may be waived or decreased an determination by the City Engineer <br />that the improvement was not available for. utilization. to the <br />subject property until a later date. <br />If. no such :assessment has. been levied, the. assessable <br />cost will be determined upon the basis of the uniform charge <br />which. may have..been lit which shall be charged for''similar tapping <br />or. connection.with said main, determined on the basis of the <br />total assessable cost of said. main.■• allocated on • a frontage <br />basis, acreage basis, or both. <br />(3) If unit charges were uniformly levied against other <br />improved property as part of the assessment proceedings for the <br />said water system, no permit to tap ar connect to any water main <br />shall be issued unless the applicant shall pay an amount equal to <br />the unit charges, based upon the same formula, levied upon other <br />improved proPerty. <br />55.242. Additional Unit Assessments. <br />(1) Prior to making any improvement which requires a <br />building permit toan existing commercial or business structure <br />upon which unit charges were uniformly assessed, the owner shall <br />be assessed an additional unit charge based on the square footage <br />to be added. <br />(2) The unit charge shall be based upon the samecriteria <br />as the original unit charge, as certified by the City Engineer. <br />(3) Such unit charge shall be paid in full prior to the <br />issuance of a building permit for such improvement. <br />55.250. Location of Stop Boxes. Curb stop boxes will be <br />installed at a point on the property line most suitable to the <br />property and shall be left in an accurate position when back <br />filling is completed. Curb stop boxes will be installed at an. <br />4-1-=8.9 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.