My WebLink
|
Help
|
About
|
Sign Out
Home
2025 06-17 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2025
>
2025 06-17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 9:25:50 AM
Creation date
10/9/2025 9:25:33 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
Show annotations
View images
View plain text
<br />Engineers | Architects | Planners | Scientists <br />Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-3507 <br />651.490.2000 | 800.325.2055 | 888.908.8166 fax | sehinc.com <br />SEH is 100% employee-owned | Affirmative Action–Equal Opportunity Employer <br />June 11, 2025 RE: City of Gem Lake, Minnesota <br />Gem Lake Water Main Extension <br />SEH No. GEMLK 185575 14.00 <br /> <br /> <br /> <br />Ms. Gretchen Artig-Swomley <br />Mayor <br />City of Gem Lake <br />4200 Otter Lake Road <br />Gem Lake, MN 55110-5231 <br /> <br />Dear Ms. Artig Swomley: <br /> <br />We are pleased to submit this letter proposal for the preparation of a feasibility report, development of <br />construction documents, assistance with the bidding process, and construction administration and <br />inspection services for the proposed water main extension from Vadnais Heights along Labore Road. The <br />project includes extending the water main from the planned Vadnais Heights system from Labore Road. <br />This letter serves as a supplement to the existing Agreement for Professional Services between the City <br />of Gem Lake, Minnesota (Owner), and Short Elliott Hendrickson Inc. (SEH®) (Consultant) for the provision <br />of professional services. <br /> <br />SCOPE OF WORK <br />We understand the scope of the project includes preparing a feasibility report, including a special benefit <br />appraisal to help the City determine a potential assessable amount. The work will also involve developing <br />construction plans for approximately 7,000 linear feet of new water main. The proposed improvements <br />will primarily utilize horizontal directional drilling along the less impactful side of the roadway, with the <br />main positioned approximately 4 feet off the edge of the road to reduce disturbance. <br /> <br />The new water main will extend from Labore Road approximately 3,100 feet along Goose Lake Road. It <br />will start again on Goose Lake Rd continue north along Haven Lane to its terminus and separately extend <br />north along Tessier Road to its end. An additional segment will extend from Goose Lake Road along the <br />private drive near Labore Road approximately 400 feet south. The project will also include a water main <br />extension from Labore Road east along Little Fox Lane for approximately 1,200 feet, then continuing <br />north along Big Fox Road for another 350 feet. Attachment B highlights the proposed project area. <br /> <br />Upon completion of the design phase, we will assist with the bidding process and provide construction <br />administration and inspection services. <br /> <br />Our scope of work for the Water Main Extension described above would be as follows: <br />· Perform a topographic survey of the project area for use in preparation of the construction plans. The <br />survey will include a review of any of the existing infrastructure within the project area to identify <br />potential conflicts with the proposed improvements. <br />· Assist City in executing the 429 Assessment Process.
The URL can be used to link to this page
Your browser does not support the video tag.