My WebLink
|
Help
|
About
|
Sign Out
Home
2025 06-17 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2025
>
2025 06-17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2025 9:25:50 AM
Creation date
10/9/2025 9:25:33 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
Show annotations
View images
View plain text
Ms. Gretchen Artig-Swomley <br />June 11, 2025 <br />Page 2 <br />· Prepare a feasibility report that will identify the proposed improvements, include an estimate of <br />probable construction costs, a proposed project schedule and a preliminary assessment role. <br />· Prepare construction plans and specifications for the improvements as described above. <br />· Coordinate with MnDOT, Ramsey County public works and private utilities to identify conflicts with the <br />proposed improvements. <br />· Review construction documents with the City prior to the advertisement for bids. <br />· Assist the City during the bidding process (advertisement for bids, bid opening, and contract award <br />processes). <br />· Construction services will include a representative on site during all relevant construction activities. <br />· Weekly construction meetings will be held to ensure the contractor remains on schedule <br />· Preparation of monthly pay app requests. <br />· Complete all paperwork and correspondence to complete the project closeout including punch lists <br />and final pay application. <br />We recommend the subsurface soils investigation and topographic survey identified as part of the design <br />phase be completed during the report phase. The soils investigation is critical to the design decisions and <br />cost estimating of the proposed improvements. <br /> <br />COMPENSATION <br />Based on our understanding of the project and the scope of services described above, SEH proposes to <br />complete this work for $218,200 which includes $8,250 for the appraisal, $24,000 for a preliminary <br />geotechnical exploration, and $13,000 for construction material testing. SEH will not exceed this cost <br />without prior authorization from the City. A detailed breakdown of tasks and fees is shown in Attachment <br />A along with listed assumptions. Compensation for the services identified in the scope of work will be <br />made on an hourly basis plus cost of reimbursable expenses. <br /> <br />SCHEDULE <br />We anticipate starting our services upon your authorization and will coordinate completing our services <br />per the anticipated project schedule shown below: <br />· Council orders preparation of feasibility report .................................................... June 17, 2025 <br />· Neighborhood Meeting #1 .................................................................................................... TBD <br />· Complete topographic survey ....................................................................................... July 2025 <br />· Complete geotechnical investigation ....................................................................... August 2025 <br />· Council accepts feasibility report and calls for Improvement hearing ........ September 16, 2025 <br />· Improvement Hearing ...................................................................................... October 21, 2025 <br />· Prepare construction plans ....................................................................... January - March 2025 <br />· Neighborhood Meeting #2 .................................................................................................... TBD <br />· Advertise project for bidding .......................................................................... March – April 2025 <br />· Bid Opening ................................................................................................................. April 2025 <br />· Accept Bids and Award Contract ........................................................................... May 19, 2025 <br />· Assessment Hearing ............................................................................................ June 16, 2025 <br />· Construction commence ............................................................................................... July 2025 <br />· Construction complete ........................................................................................... October 2025
The URL can be used to link to this page
Your browser does not support the video tag.