My WebLink
|
Help
|
About
|
Sign Out
Home
2020 08-18 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2020
>
2020 08-18 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2025 11:36:05 AM
Creation date
11/19/2025 11:34:14 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
Show annotations
View images
View plain text
Gem Lake, MINNESOTA <br />Hoffman Rd Improvements <br />Clty Project <br />SEH FILE GEMLK <br />RECONSTRUCTION <br />Hoffman Rd <br />(TRUNK HIGHWAY 81 TO Cc.ty Rd E) <br />I'1orTman <br />KOaa l.OBL Lsumale <br />ITEM <br />NO. <br />N0. <br />ITEM DESCRIPTION <br />UNIT <br />UNIT PRICE <br />ESTIMATED <br />QUANTITY <br />ESTIMATED COST <br />1 <br />MOBILIZATION <br />LS <br />$18 000.00 1.00 <br />$18,000.00 <br />2 <br />EDGE MILL BITUMINOUS SURFACE 2.0" <br />LF <br />$3.25 <br />200 <br />$650.00 <br />3 <br />PULVERIZE BITUMINOUS PAVEMENT 6" MIN. DEPTH) P <br />SY <br />$1.50 <br />3,7 <br />$5.601.00 <br />4 <br />SUBGRADE PREPARATION <br />RD STA <br />S325.00 <br />11 <br />S3 575.00 <br />5 <br />COMMON EXCAVATION P <br />Cy- <br />$12.00 <br />1,300 <br />$15.600.00 <br />6 <br />SANDY LOAM TOPSOIL SORROW C <br />CY <br />$30.00 <br />161 <br />$4 830.00 <br />7 <br />STREETSWEEPER (WITH PICKUP.BROOM) <br />HOUR <br />$125.00 <br />6 <br />$750.00 <br />9 <br />AGGREGATE BASE SPECIAL C <br />Cy <br />$15.00 <br />400 <br />$6 000.00 <br />9 <br />CONCRETE CURB& GUTTER SPOT REMOVE & REPLACE <br />LF <br />$25.00 <br />106 <br />$2 650.00 <br />10 <br />CONCRETE CURB & GUTTER B618 <br />LF <br />$12.00 <br />1,450 <br />$17,400.00 <br />11 <br />CONCRETE DRIVEWAY PAVEMENT <br />SY <br />$50.00 <br />300 <br />$15 000.00 <br />12 <br />4" PE PERF PE PIPE DRAIN WI GEOTEXTILE FILTER SOCK &MEDIUM FILTER AGG. <br />LF <br />$13.00 <br />50 <br />$650.00 <br />13 <br />16"-24"RCP. SEWER <br />LF <br />$70.00 <br />400 <br />$20,000.00 <br />14 <br />MINOR STRUCTURE REPAIR: <br />EACH <br />$300.00 <br />2 <br />$600.00 <br />15 <br />CONSTRUCT DRAINAGE STRUCTURE 48.4020 <br />EACH <br />$3.000.00 <br />2 <br />$6 000.00 <br />16 <br />I'TYPE K COPPER <br />LF <br />$30.00 <br />2501 <br />$7 500.00 <br />17 <br />1" CORPORATION STOP <br />EACH E <br />5300,00 <br />4 <br />$1 200.00 <br />18 <br />1"CURB STOP AND BOX <br />EACH <br />.$400,00 <br />.4 <br />Si 600.00 <br />19 <br />HYDRANT <br />EACH <br />$50013.00 <br />2 <br />$10.000.00 <br />20 <br />4" GV AND BOX <br />LF <br />$1,400.00 <br />2 <br />$2 800.00 <br />21 <br />6" GV AND BOX <br />LF <br />$2 OD0.00 <br />3 <br />$6 000.00 <br />22 <br />8' GV AND BOX <br />LF <br />$2 500.00 <br />2 <br />S5,000.00 <br />23 <br />4" WATER MAIN DUCTILE IRON CL 52 <br />LF <br />$45.00 <br />100 <br />$4.500.00 <br />24 <br />6" WATER MAIN DUCTILE IRON CL 52 <br />LF <br />$50.00 <br />80 <br />$4 000.00. <br />25 <br />8` WATER MAIN DUCTILE IRON CL 52 <br />LF <br />S55,00 <br />950 <br />S52 250.00 <br />26 <br />AGGREGATE BASE CL 5 CV <br />Cy <br />$20,00 <br />1,32 <br />$26,400,00 <br />27 <br />TYPE SP 9.5 WEARING COURSE MIX 3 C <br />TON <br />S90.00 <br />528 <br />$47 620:00 <br />28 <br />TYPE SP 9.5 WEARING COURSE MIX 2 B DRIVEWAYS REMOVE & REPLACE <br />TON <br />$125.00 <br />85 <br />$10625:00 <br />29 <br />TYPE SP 12.5 WEARING COURSE MIX 3 C <br />TON <br />$85.00 <br />791 <br />S57,235.00 <br />30 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GAL <br />$3.0D <br />215 <br />$645,00 <br />31 <br />TRAFFIC CONTROL <br />LS <br />$B 000.00 <br />1.00 <br />58,DDD.DO <br />32 <br />HYDROSEEDING. <br />Sy <br />S4.00 <br />967 <br />53,868.00 <br />[33 <br />BIOROLL!SILT'FENCE <br />LF <br />$4.00 <br />300 <br />$T20D.00 <br />:3:4 <br />INLET PROTECTION I <br />EACH <br />$25o.001 <br />5 <br />$1250.OD <br />UBTOTAL $3815,899.60 <br />1595 CONSTRUCTION <br />ONTINGENCIES $58,034.85 <br />COST $444,933.85 <br />$111,233.46 <br />(TOTAL ESTIMATED COST $556,167.31 Q <br />10/1112018 7:56 AM fivGlGemlklcommonvm Hoffman rd HWY 61 to CTYE1Hoffman Rd reconslrucLxlsx <br />
The URL can be used to link to this page
Your browser does not support the video tag.