Laserfiche WebLink
ELECTRICAL PERMIT. FEES - City -of Oem Lake -January 1,.2020 <br />HOMEOWNERS AND ELECTRICAL CONTRACTORS: Completean electrical permit form available from the Building <br />Inspections Division. Add $1..00 for State.surcharge to. total cost of each permit. The fee is the total of the. listed fees or the total number <br />of inspection trips x $45.00. whichever is greater. <br />Residential panel replacement Is..$11 a00, sub <br />panel $45.00. New service or power supply Is: <br />Cffcuits and Feeders <br />0 to 300 Amp $55.00 <br />0-100 Amp. <br />$9.00 <br />400 Amp $71; 00. <br />101-200Amp <br />$15.00 <br />500 Amp $87:00 <br />.201-300: Amp <br />$21.00 <br />60.0 Amp $1.03.00 <br />301-40.0 Amp <br />$27.00 <br />6D.D Amp $135;00 <br />401-5o0.Amp <br />$33:00 <br />1000.Amp $167.00 <br />.501-K0 Amp <br />$39.00 <br />Add $16.00 for each additional 10.0 amps Add .$6..00 for each additional 100 amps <br />Minimum Fee: <br />Maximum Fee: <br />Minimum permit fee is $45.00 plus $.1.00 <br />Maximumfee for single family dwelling or <br />State surcharge. This is for one inspection <br />townhouse not over.200 amps (No max if <br />only. Minimum fee for rough4n and final <br />service is over 200Anips). is $190.00 plus <br />inspection is $90.00 plus $1.0.0 State surcharge. <br />$1.00 State surcharge. Maximum of 2 rough-in's and 1 final <br />Inspection. (Failed Inspections are an additional $45.00 each) <br />Apartment Buildings <br />Fee per unit of an apartment or condominium complex --is $&G.o }. <br />This does not cover service, unit feeders orhouse panels. <br />Swimming Pools and Hot Tubs <br />$90,00 plus circuits aY$S.00Teach: This -includes 2 inspections. <br />Additions, Remodels or <br />Basement Finishes <br />$90.00 this include.up.40 10 circuits an$2 inspections <br />Residential Accessory Structures <br />The Greater..of $55.00. for panel plus.$9.00 per circuitor $90 for 2 <br />Inspections. <br />TrafficSignals <br />$8.00 per each.standard <br />Street and Parking Lot Lights <br />$5.00 per each.standard <br />Transformers and. Generators <br />$5 up to 10kv6, $40 11 to 74kva;:.$60 75kva to 299kva, over 299kva is <br />$166 <br />Retrofit Lighting <br />$O.B5pep ts.per-CAUre <br />Sign Transformer or Driver <br />$9.06pert4nsformer <br />Low voitage fire alarm, low voltage heating <br />$0.05-oentsper device <br />and air conditioning control wiring <br />Re -Inspection Fee in addition <br />$45•00• <br />to all other fees <br />Hourly rate for carnivals <br />$90A0 <br />Solar fees: <br />Okw to 5kW = $90 5.1 kw to 'I Okw !d VAO <br />10.1 kw to 201(w = $225 20.1 kw- to 30kw = $300 <br />30.1kw to 40kw = $376 40.lkw:arid largeris $375 <br />plus $25 for each additional 10kw <br />Electronic inspection: fee for these Items 0hly; #umaoe; aircxirtditioning, bath fan, fireplace or receptacle for water <br />heatervent is $40. <br />Refunds rnust be requested in: writing.. No refunds. unlp4$'more4ian.the minimum fee.: Refunds are minus the cities 20% handling fee... <br />THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED. <br />