Laserfiche WebLink
<br />mail boy <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Nov./Dec., 2015 <br />Volume 9, Issue 7 Gem Lake News <br />Special Interest <br />Articles: <br /> <br />• Assessment <br />Hearing for Water <br />Project <br /> <br />• Bids Accepted for <br />Water Project <br /> <br />• City News Page 4 <br /> <br />• 2016 Budget to be <br />Finalized <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Upcoming Recycling <br />Dates: <br /> November 25 <br /> December 9 <br /> December 23 <br />Tip: put out your bin <br />the night before for 7 <br />a.m. pick-up. <br /> <br /> <br />Gretchen Artig-Swomley, Newsletter Editor <br />There will be an assessment hearing on <br />November 19 at 7:00 p.m. at Heritage Hall to <br />discuss the municipal water project for the <br />Hoffman’s Corner Business District. <br /> <br />All affected businesses and property owners are <br />encouraged to attend. The meeting is open to the <br />public and may be of interest to all residents of <br />Gem Lake. At this meeting the results of a <br />appraisal study of the area will be discussed, <br />primarily focusing on how much increased value <br />this project would bring to each property owner. <br /> <br />The total cost of this two part project will be <br />approximately $510,000. This includes $387,838 <br />for construction costs (see below) and $122,162 <br />for engineering and other costs. Part One would <br />bring water from White Bear under the railroad <br />tracks near White Bear Floral and then across to <br />the area of Waldoch Mfg. and the strip mall on <br />Scheuneman Road. <br />(continued on page 2) <br /> <br /> <br /> <br /> <br /> <br />Assessment Hearing November 19 <br /> <br />Bids Accepted, Contractor Chosen for Water Project <br />On October 20th, the City Council voted to direct <br />the city engineer to draft final plans and <br />specifications for a two part water project, and to <br />request bids for the construction end of the project <br />from appropriate vendors. At the November 17th <br />City Council Meeting, the bids were reviewed and <br />discussed. The bids for the construction costs <br />ranged from $387,838 to $629,700. <br /> <br />There were eight bidders to the Water Main <br />Extension Project, which is designed for the <br />extension of a water main along County Road E <br />between Hoffman Road East in White Bear Lake <br />and Scheuneman Road in Gem Lake by the City of <br />Gem Lake. All were deemed to be qualified <br />bidders in terms of expertise and experience. After <br />review by the city engineers (which is done <br />through Short, Elliot and Hendrickson, or SEH), <br />the contract was awarded to the lowest bidder, <br />which was Dave Perkins Contracting, Inc. The <br />construction will commence in the Spring of 2016. <br /> <br /> <br /> <br /> <br /> <br /> <br />