Laserfiche WebLink
Luther Cadillac Project Staff Report April 12, 2022 <br />Gem Lake Planning Commission Page.3 <br />conditional use., the application must adhere to the criteria for a conditional use, which.is listed in Section <br />17,5 of the ordinance. These criteria are discussed later in this staff report. <br />Setback requirements <br />The. applicant has. a unique:situatiori :in that their proposed use will be.exterlding over a property line. <br />Typically, if two lots are being use fora use and are under.the .same ownership, they would be combined <br />so that there is not a lot line running through the siteAn this situation, though, the lot line is also a <br />municipal boundary,. and a lot cannot be located in two different municipalities. In.order to allow the <br />parking lot for this site to be Built over the property line: and connect with the rest of the site in Vadnais <br />Heights, a variance to. allow a zero' foot setback is. necessary. Variances are to meet: the. criteria found .in <br />Section 17.2 of the ordinance.. These criteria are discussed later in this staff report. <br />Screening & Landscaping <br />Section 18.5 of the ordinance covers screeningrequirements for new developments; landscaping is. <br />located. in Section 1.8.6; The applicant is proposing to put up both a small retaining wall and landscape <br />plantings that would. screen the. parking from the current house to the north. The Commission may require <br />additional screen ing.as a condition onto the .CUP (such .as a fence or wall of a certain height, or additional <br />landscape plantings) if there is additional need to. screen the use from the neighboring property to the <br />north: <br />Parkland Dedication <br />Section 18.20 notes the dedication of land for parks is required as part ofaplat. Cash payments in lieu of <br />land dedication can.also be made that are placed in the 'park fund.. If dedicating Iand, 10°Io.of the total.site <br />acreage is to be dedicated to the city;. if making a.cash. contribution in Ileu of land, the payment would be <br />10% of the pre -development land value. The Commissioncan require land, cash in lieu of Iand, or a <br />combination of the. two. Given the use of the site, and existing adjacent land .uses;. cash..in lieu of parkland <br />may be. ideal. This would: be included as a.condition on.the CtJP.approvai.. <br />Parking Requirements <br />Section 20 of the ordinance covers off-street parking. The site, due to its unique design, is all. off street <br />parking, as the principal structure for the. use. will be located on the..parcel.within Vadnais Heights. Given: <br />the building is within Vadnais Heights, the minimum number of stalls required was based off of their. code <br />requirements, which was.187 stalls; The parking on the Vadnais Heights side of the project.satisfies their <br />code..requirements, and results. in the parking located within Gem Lake as parking that is not required by <br />code, but is still permitted: <br />Staff Comments <br />As part of the review of the request, comments. were collected from staff and other agencies. involved or <br />interested with the project, <br />Watershed <br />The subject parcel is. located within the Ramsey -Washington Metro Watershed pistrict. The District noted <br />the plans from the applicant meet their requirements, and that they can issue.their permits upon. <br />completion of .a stormwater maintenance agreement with the applicant. <br />MnDO T <br />Due to the proximity with Highway 6.1; the.Depadment of Transportation was notified for comments. <br />regarding the. project: At time of this staff report, MnDOT has not provided any comments on the project.. <br />7 <br />