My WebLink
|
Help
|
About
|
Sign Out
Home
2025 12-02 PC Packet
GemLake
>
PLANNING
>
PACKETS
>
2020 - 2029
>
2025
>
2025 12-02 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 8:43:29 AM
Creation date
12/4/2025 8:41:12 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
PLANNING PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
Show annotations
View images
View plain text
Jed Schmidt, Forty7, LLC, Woodlane Drive Single-Familty Residential Development <br />City of Woodbury, Washington County, Minnesota <br />3 <br />Landscaping is designed to meet City requirements, including a 20-foot landscaped front yard and the installation of <br />16 trees and 32 shrubs. Six Prairie Sentinel Hackberry trees are proposed along Scheuneman Road to enhance <br />streetscape character. This species is native, tolerant of varied soil conditions, and provides effective screening with <br />its narrow upright form. A row of Techny Arborvitae is proposed along the south property line to provide year-round <br />visual screening from adjacent uses. <br /> <br />Site utilities and stormwater management have been planned to meet City standards and support the proposed <br />building and outdoor storage use. Sanitary sewer and water service will connect to the existing leads within <br />Scheuneman Road to serve the new building. Stormwater management consists of rate control and will be provided <br />via a small basin located in the southwest portion of the site. The proposed grading plan directs as much runoff as <br />practicable to this basin, to reduce overall discharge from the site. <br /> <br />A Conditional Use Permit is requested to allow outdoor storage associated with KRUNCH business operations. Based <br />on the proposed site design and operational characteristics, the request satisfies the required findings for approval <br />as follows: <br /> <br />1. There will be no detraction from the appearance of adjacent properties, or the City as a whole. <br />Outdoor storage is screened from public view and will have a clean and orderly appearance along <br />Scheuneman Road. <br />2. There will not be aesthetic incompatibility. <br />The use is consistent with surrounding commercial and light industrial land uses. Building placement, <br />landscaping, and screening ensure visual compatibility with the corridor. <br />3. There will not be aural incompatibility (noise). <br />The business generates minimal noise, limited to standard vehicle movements during daytime operating <br />hours. No mechanical processing or high-noise activities occur outdoors. <br />4. There will not be damage to vegetation. <br />All proposed improvements retain existing vegetation where feasible, and new landscaping will be installed <br />to enhance site screening. <br />5. Traffic patterns will not be negatively affected. <br />The operation has low traffic demand with only two employees on site and no customer traffic. The existing <br />roadway network adequately supports the use. <br />6. There is no unnecessary loss of existing natural features. <br />The site is predominantly vacant with limited natural features. The project improves drainage and adds <br />new plantings in compliance with City standards. <br />7. The use will not cause soil erosion. <br />Temporary stabilization has been installed, and permanent grading, stormwater, and erosion control <br />measures will be implemented in accordance with City requirements. <br />8. The use will not increase flood potential. <br />Proposed stormwater management improvements maintain compliant runoff rates and do not increase <br />downstream flooding risk. <br />9. The proposal is consistent with the Comprehensive Plan and complies with other ordinances. <br />The development supports reinvestment in a vacant commercial property, meets applicable performance <br />standards subject to CUP approval. <br /> <br />Construction is intended to begin in Spring of 2026 and is anticipated to take about 3 months to complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.