My WebLink
|
Help
|
About
|
Sign Out
Home
2025 12-02 PC Packet
GemLake
>
PLANNING
>
PACKETS
>
2020 - 2029
>
2025
>
2025 12-02 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 8:43:29 AM
Creation date
12/4/2025 8:41:12 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
PLANNING PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
Show annotations
View images
View plain text
961.5 <br />MHSA <br />955 <br />955 <br />956 <br />957 <br />958 <br />959 <br />960 <br />957 <br />958 <br />960 <br />962 <br />960 <br />960 <br />955 <br />950 <br />963 <br />963 <br />964 <br />96 <br />4 <br />9 <br />6 <br />5 <br />96496 <br />3 <br />9 <br />6 <br />2 <br />9 <br />6 <br />1 <br />963 <br />962 <br />961 <br />9 <br />6 <br />0 <br />9 <br />6 <br />5 <br />9 <br />6 <br />4 <br />963 <br />9 <br />6 <br />2 <br />9 <br />6 <br />1 <br />960 <br />963 <br />95 <br />5 <br />93 <br />693 <br />7 <br />9 <br />6 <br />2 <br />963 <br />964 <br />9 <br />6 <br />0 <br />9 <br />5 <br />9 <br />9 <br />5 <br />8 <br />9 <br />5 <br />7 <br />963 <br />964 <br />9 <br />6 <br />4 <br />95 <br />5 <br />960 <br />96 <br />0 <br />95 <br />0 <br />94 <br />5 <br />94 <br />0 <br />93 <br />6 <br />96 <br />0 <br />95 <br />5 <br />95 <br />0 <br />94 <br />5 <br />94 <br />0 <br />93 <br />6 <br />96 <br />4 <br />95 <br />5 <br />95 <br />0 <br />94 <br />5 94 <br />0 <br />96 <br />0 <br />95 <br />5 <br />95 <br />0 <br />94 <br />5 <br />94 <br />0 <br />93 <br />7 <br />96 <br />2 <br />93 <br />7 <br />963 <br />96 <br />4 <br />>>>>>> <br />>> <br />>> <br />4.19% <br />962 <br />2. <br />0 <br />0 <br />% <br />9 <br />6 <br />2 <br />9 <br />6 <br />3 <br />9 <br />6 <br />4 <br />96 <br />0 <br />95 <br />996 <br />1 <br />960 <br />958 <br />9 <br />6 <br />0 <br />9 <br />5 <br />9 <br />9 <br />6 <br />1 <br />9 <br />6 <br />2 <br />961 <br />962 <br />4:1 <br />5:1 <br />961 <br />962 <br />963 <br />960 <br />961 <br />962 <br />960 <br />958 <br />959 <br />961 <br />961 <br />962 <br />963 <br />62.97 <br />63.40 <br />64.00 <br />64 <br />. <br />0 <br />0 <br />64 <br />. <br />0 <br />0 <br />64.0 <br />0 <br />64.50 <br />2. <br />2 <br />7 <br />% <br />64.50 <br />64 <br />. <br />5 <br />0 <br />64.50 <br />2. <br />2 <br />7 <br />% <br />12 <br />. <br />5 <br />0 <br />% <br />12 <br />. <br />4 <br />9 <br />% <br />63.8 <br />1 <br />3.43% <br />63.40 <br />5.49% <br />63 <br />. <br />9 <br />5 <br />2 <br />. <br />7 <br />8 <br />% <br />63.6 <br />5 <br />63 <br />. <br />4 <br />5 <br />4.20% <br />5.26% <br />2.6 <br />6 <br />% <br />60 <br />. <br />7 <br />0 <br />6 <br />1 <br />. <br />8 <br />0 <br />62.18 <br />61.53 <br />62.05 <br />6 <br />1 <br />. <br />8 <br />6 <br />6 <br />1 <br />. <br />0 <br />9 <br />62.75 <br />62.66 <br />964 965 <br />963 <br />6 <br />2 <br />. <br />8 <br />7 <br />63.9 <br />0 <br />63.50 <br />62.47 <br />61.56 62.06 <br />6 <br />3 <br />. <br />2 <br />7 <br />62.8062.80 <br />62.76 <br />62.53 <br />62.27 <br />6 <br />2 <br />. <br />7 <br />7 <br />6 <br />2 <br />. <br />3 <br />9 <br />62.39 <br />62.7 <br />2 <br />60.00 <br />4:1 <br />961 <br />62.70 <br />5.22% <br />3. <br />8 <br />6 <br />% <br />2.9 <br />1 <br />% <br />2.00% <br />2.00%2.20%3.01% <br />3 <br />. <br />3 <br />7 <br />% <br />3:1 3.97 <br />% <br />2. <br />0 <br />7 <br />% <br />5.80 <br />% <br />2.2 <br />6 <br />% <br />3.07% <br />61.7 <br />0 <br />63.30 <br />SF <br />SF <br />S <br />F <br />SF <br />SF <br />S <br />F <br />SF SF SF SF SF SF SF SF SF SF <br />SF <br />SF <br />SF SF <br />SF <br />SF <br />SF <br />SF <br />SF <br />SF <br />SF <br />SF <br />SF <br />SFSFSFSFSFSFSFSFSFSFSFSFSF <br />SF <br />EOF <br />EO <br />F <br />EOF <br />3. <br />4 <br />5 <br />% <br />5 <br />. <br />2 <br />5 <br />% <br />(59.94) <br />(61.89) <br />(64.03) <br />EXISTING STORM <br />PROPOSED STORM <br />PROPOSED <br />BUILDING <br />4,800 SF <br />FFE = 964.50 <br />PROPOSED YARD DRAIN <br />X- <br />R <br />e <br />f <br /> <br />D <br />w <br />g <br />: <br />2 <br />5 <br />0 <br />1 <br />8 <br />- <br />B <br />o <br />r <br />d <br />e <br />r <br />. <br />d <br />w <br />g <br />X- <br />R <br />e <br />f <br /> <br />D <br />w <br />g <br />: <br />2 <br />5 <br />0 <br />1 <br />8 <br />- <br />S <br />U <br />R <br />V <br />E <br />Y <br />. <br />d <br />w <br />g <br />X- <br />R <br />e <br />f <br /> <br />D <br />w <br />g <br />: <br />2 <br />5 <br />0 <br />1 <br />8 <br />- <br />B <br />A <br />S <br />E <br />. <br />d <br />w <br />g <br />X- <br />R <br />e <br />f <br /> <br />D <br />w <br />g <br />: <br />2 <br />5 <br />0 <br />1 <br />8 <br />- <br />U <br />T <br />I <br />L <br />. <br />d <br />w <br />g <br />X- <br />R <br />e <br />f <br /> <br />D <br />w <br />g <br />: <br />2 <br />5 <br />0 <br />1 <br />8 <br />- <br />G <br />R <br />A <br />D <br />. <br />d <br />w <br />g <br />Dr <br />a <br />w <br />i <br />n <br />g <br />: <br />P <br />: <br />\ <br />P <br />r <br />o <br />j <br />e <br />c <br />t <br />s <br />\ <br />2 <br />5 <br />0 <br />1 <br />8 <br /> <br />- <br /> <br />S <br />c <br />h <br />e <br />u <br />n <br />e <br />m <br />a <br />n <br /> <br />R <br />d <br />, <br /> <br />G <br />e <br />m <br /> <br />L <br />a <br />k <br />e <br />, <br /> <br />M <br />N <br />\ <br />P <br />r <br />o <br />d <br />u <br />c <br />t <br />i <br />o <br />n <br />\ <br />_ <br />S <br />h <br />e <br />e <br />t <br /> <br />D <br />r <br />a <br />w <br />i <br />n <br />g <br />s <br />\ <br />2 <br />5 <br />0 <br />1 <br />8 <br />- <br />C <br />3 <br />. <br />0 <br />. <br />d <br />w <br />g <br />La <br />y <br />o <br />u <br />t <br />: <br />2 <br />2 <br />x <br />3 <br />4 <br />Da <br />t <br />e <br />: <br />N <br />o <br />v <br /> <br />0 <br />5 <br />, <br />2 <br />0 <br />2 <br />5 <br />, <br />3 <br />: <br />3 <br />5 <br />p <br />m <br />Grading, <br />Drainage, & <br />Erosion Control <br />Plan <br />C3.0Know what's below.Call before you dig.0 20 40 <br />N <br />20 scale <br />DATEISSUE / REVISION <br />11-05-2025Site Plan Review <br />3863 Crestwood Place <br />White Bear Lake, MN 55110 <br />Phone: 651-338-8848 <br />Review By: RH <br />Project # : 25018 <br />Submittal Date: 11-05-2025 <br />Submittal Phase: Site Plan <br />Review <br />Copyright Land & Resource Consulting <br />Joe Huth <br />KRUNCH <br />Dumpster <br />Gem Lake, MN <br />MN. Lic. No. 19576 <br />Date: <br />Randall C. Hedlund <br />I hereby certify that this plan, specification, or <br />report was prepared by me or under my <br />direct supervision and that I am a duly <br />Licensed Professional Engineer under the <br />laws of the State of Minnesota. <br />PR <br />E <br />L <br />I <br />M <br />I <br />N <br />A <br />R <br />Y <br /> N <br />O <br />T <br /> <br />F <br />O <br />R <br />CON <br />S <br />T <br />R <br />U <br />C <br />T <br />I <br />O <br />N <br />14260 23rd Ave N <br />Plymouth, MN <br />Phone: 763-340-0699 <br />DRAWINGS BY <br />DRAWINGS FOR <br />PROJECT <br />CERTIFICATION <br />ISSUED FOR <br />SUBMITTAL INFO <br />SHEET TITLE <br />SHEET NUMBER <br />General Grading & Erosion Control Notes <br />1.For surveying and construction staking, contact Land & Resource Consulting 763.340.0699. <br />2.Erosion control measures shall be installed prior to the start of construction. <br />3.Install inlet protection: Wimco RD or CG models or approved equal. Inspect, clean and maintain inlet <br />protection though the course of construction. <br />4.Soil disturbance and grading practices shall be minimized and staged as much as possible. Restoration <br />and stabilization shall be installed in accordance with the SWPPP time requirements or sooner. <br />5.All erosion control practices shown are to be considered the minimum. Additional erosion control <br />practices, measures and materials may be necessary to stabilize sediment within the construction site <br />during during construction. <br />6.Infiltration areas shall be protected during the course of construction to prevent migration of sediment into <br />the infiltration areas. Sediment must removed from the basin bottom and the surface shall the roughed <br />and scarified to achieve the original infiltration rates. <br />7.Surface stabilization and turf shall meet the following standards: <br />Item MnDOT Ref. Spec. <br />Sod MnDOT 3878 <br />Seed MnDOT 3876 <br /> Apply MN Type 21-111 @ 100 lb./acre - Temporary Erosion Control <br /> (May 1 - July 31) <br /> Apply MN Type 21-112 @ 100 lb./acre - Temporary Erosion Control <br /> (Aug. 1 - Oct. 31) <br /> Apply MN Type 25-151 /2 120 lb./acre - Permanent Turf <br />Mulch MnDOT 3882 <br /> Install MN Type 1 @ 2 ton/acre - Disc anchored <br />Erosion Control Blanket MnDOT 3885 <br /> Install MN Type 3N (12 mo.) or Type 4N (24 mo.) <br />Fertilizer MnDOT 3881 <br /> Apply in accordance with product standards. MN <br />8.Refer to Geotechnical Investigation completed by Haugo Geotechnical Services dated 08/08/2025 for <br />grading, backfill, soil corrections, compaction and groundwater conditions. Contact Haugo during the <br />course of construction to perform material and compaction testing. <br />9.Clear and grub construction area. Stockpile topsoil for reuse. <br />10.Once the curb and gutter has been installed, place silt fence or and approved equivalent at the back of <br />the curb <br />Infiltration Basin & Testing <br />12.Install erosion control fencing as shown prior to the start of construction. <br />13.Avoid soil compaction of infiltration basin area. Equipment within infiltration basin shall be light weight and <br />tracked. <br />14.The bottom of the infiltration basin shall be scarified to a depth of 12" prior to topsoil and seeding. <br />15.The contractor shall engage a third party material testing consultant to confirm the following: <br />15.1.The infiltration rates meet or exceed the rates for each basin as outlined in the project storm water <br />narrative using a double-ring infiltrometer. <br />15.2.Contact the engineer and owner if any rates do not meet or exceed design parameters. <br />15.3.The frequency of the infiltration tests shall be established by the governing agency. <br />Legend <br />Silt FenceSF <br />Inlet Protection <br />Construction Entrance <br />Erosion Control Blanket <br />Spot Elevation - Proposed <br />Proposed Contour <br />11.94 <br />900 <br />Spot Elevation - Existing(11.94) <br />EOF Emergency Overflow <br />>>Storm Sewer
The URL can be used to link to this page
Your browser does not support the video tag.