My WebLink
|
Help
|
About
|
Sign Out
Home
2024 09-10 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2020 - 2029
>
2024
>
2024 09-10 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 8:14:52 AM
Creation date
12/9/2025 8:11:33 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
PLANNING PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
Show annotations
View images
View plain text
Barnett Kia Narrative <br />July 22, 2024 Page 2 of 3 <br /> <br /> <br /> <br /> <br /> <br /> <br />Brief Project Description <br /> <br />Barnett Properties proposes to construct a new partial two story 38-40,000 SF <br />automotive dealership facility for its Kia dealership at 3610 Highway 61. The existing facility <br />will remain operational during construction of the new dealership. Once the new building is <br />complete the business will move into the new building. The old dealership building will then be <br />demolished, and the balance of site work will be completed. <br /> <br />Barnett Kia has been offered significant financial incentives from Kia to begin construction in <br />2024 and complete it before the end of 2025. <br /> <br />Currently Barnett Kia is a legal non-conforming use. Barnett prefers to have the Gem Lake <br />zoning code amended to construct the new building as a legal conforming use as opposed to <br />proceeding under non-conforming status. The project offers significant benefits for the city. <br />The more than 55-year-old existing building will be replaced by a new state-of-the-art facility <br />with a corresponding increase in the tax base. The site will be reconfigured for modern storm <br />water management including reducing the impervious surface from about 98% to 80%. <br />Landscaping will be added along with modern well controlled LED site lighting. <br /> <br /> Zoning Requests <br /> <br />Barnett is requesting approvals for this project including: <br />1. Proposed zoning amendment permitting Automotive Dealership in the Gateway NC <br />District <br />2. A zoning compliance review based on the amended zoning. <br />3. Approval of a common lot line adjustment between 3610 and 3700 Highway 61 <br /> <br />Scheduling <br /> <br />Barnett plans to solicit construction bids in September of 2024 for a construction start as <br />soon as October. Occupancy of the new dealership building would be expected by November 15, <br />2025. The demolition of the old dealership and completion of the site work would then be in the <br />fall of 2025. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.