Laserfiche WebLink
Barnett Kia Narrative <br />July 22, 2024 Page 3 of 3 <br /> <br /> <br /> <br /> <br /> <br /> <br />Civil Engineering and Landscaping <br /> <br />Civil engineering plans along with a landscape plan have been submitted with this zoning <br />application. Please note the impervious surface will have a significant reduction with approval of <br />this application. <br /> <br />Site Lighting <br /> <br />A Lighting plan has been submitted for the lot. The project will have all new suite lighting using <br />the latest LED technology. The fixtures will be dimmable and have motion sensors for night <br />security. The computer-controlled lighting will be set up to meet the city requirements. The site <br />lighting will be dimmed at 10:30PM to security lighting levels except along Highway 61. The <br />lighting along Highway 61 will be dimmed at 1AM. <br /> <br />Building Materials <br /> <br />The dealership building will have scored precast wall panels will integrally Coventry Gray cast in <br />color for the service shops, detail area and carwash. The service line on the north side will have a <br />black ACM and glass exterior with glass overhead doors. The showroom portion of the building <br />will be glass curtain wall with a black ACM facia. This will wrap partially around the east and west <br />sides. Please refer to the artist renderings submitted with this application and exterior <br />elevation sheets A3.1 and A3.2 for additional info. <br /> <br />PHILLIPS Architects on behalf of Barnett Properties and Barnett Kia respectively requests <br />the City Council approval of these zoning applications. <br /> <br />