My WebLink
|
Help
|
About
|
Sign Out
Home
1994 07-18 CCP
GemLake
>
CITY COUNCIL
>
PACKETS
>
1990 - 1999
>
1994
>
1994 07-18 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2026 8:59:47 AM
Creation date
6/19/2019 10:47:06 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKET CITY COUNCIL
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
Show annotations
View images
View plain text
Where the conditions meet funding criteria and where the city is in agreement with the planned on -road <br />trail, thetrail developmentwill be included as part of the road improvement activity. Off -road trails will <br />involve more scrutiny due to the additional funding that might be required. Complete funding <br />accountability will need to be reviewed and approved prior to any trail development: of this type. <br />When roadway systems are designated on state or county right of way, City officials should make every <br />effort to pursue cost -sharing options. <br />C. Neighborhood Trails <br />In new developments, the developer is responsible for acquisition and development of sidewalks and trails. <br />This is best handled by incorporating any sidewalks and trails into the development plans prior to the start <br />of construction. Incases where the trail will beputin after the initial constructionphase, the acquisition <br />of the required land should be worked out with all appropriate parties who have property abutting the <br />proposed: trail :site. <br />3ELL alliZWAYLLEAUt n T_EM <br />Maps included in the Appendix show existing trails, proposed trails, and the comprehensive trail system. <br />EXISTING TRAILS (Map 1): This map shows the on -road and off -road trails that exist as of the summer of <br />1993. Some trails may still be under construction. <br />PROPOSED TRAILS (Map 2): This map shows the proposed trails as either on -road or off -road. Trail <br />numbers are included to correspondwith the priority system trail descriptions. <br />COMPREHENSIVE TRAIL SYSTEM (Map 3): This map is a combination of existing trails and proposed <br />trails. City parks are marked with a P, destination points are marked with a D, City Center areas are <br />marked with a C, and connection points to other communities are shown asextensions of the marked trails <br />into the neighboring community atthe appropriate locations. <br />Vill. TRAMS .A Fop PATHWAYS INAINTENAVCE <br />A Trail maintenance program may include the following maintenance operations: repairs to trail surface, <br />sweeping, snow removal, sod repair, seal coating, mowing, striping and signage. The level of maintenance <br />service is determined by local officials representing their community. Subsequently, each municipality will <br />have varying .levels of trail and- pathway maintenance. <br />Standard trail widths will help to reduce the number and the types of vehicles required to maintain trails. <br />Vadnais. Heights currently has several pick-ups with 8' plows, a 5' sweeper, and 6' and 4' snow blowers. <br />Cities with several miles of trails and walkways have specialized pieces of equipment which are primarily <br />used for snow removal from trails and pathways. These vehicles are narrow four-wheel drive units that can <br />9 May 5, 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.