My WebLink
|
Help
|
About
|
Sign Out
Home
2021 09-21 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2021
>
2021 09-21 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2025 12:41:33 PM
Creation date
12/29/2025 12:38:14 PM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
Show annotations
View images
View plain text
Consulting Party input received pursuant to this. Stipulation as Project plans are <br />further developed. <br />C. The Metropolitan Council's Preservation Lead shall. review all Project plans at the 30, <br />60190, and 100 percent (%), or equivalent, design stages. The Metropolitan Councils. <br />Preservation Lead shall also review any modifications made to the 100%Project <br />plans, whether those changes are made prior to, or daring, Project construction. <br />L At each stage of the review, the Met ropolitan.Council's Preservation Lead shall <br />recommend to FTA whether revisions are necessary to the Projeet's APE, whether <br />any.Project design changes may result in a change to FTA's finding of effect,. <br />whether the design requirements of Stipulation V have been met, and whether the <br />Plans: incorporate commitments made to the Consulting Parties through <br />consultation under Stipulations VI and XII. <br />a. If FTA agrees revisions to the APE are necessary, they shall be completed <br />Pursuant to Stipulation IX; <br />b. If FTA agrees the previously made finding of effect remains valid, design - <br />related requirements. have been met, and all commitments reached during <br />consultation have been incorporated into Project design, the FTA shall. notify <br />the Consulting Parties of its findings. Unless otherwise noted in Subparagraph <br />CAi of this Stipulation; notification may be completed through the reporting <br />process outlined in Stipulation'XV. <br />C. If FTA agrees that the previously made finding of effect is no longer valid, if <br />design -related requirements have not been met, or if commitments reached <br />during consultation are not incorporated into Project design, then FTA shall <br />make a new finding of effect with the. assistance of the Metropolitan Council's <br />Preservation Lead pursuant to Stipulation XI. <br />ii. For Project elements requiring Consulting Party review under Stipulation VI, the <br />30% and 60% Project plans shall be submitted to Consulting Parties for review <br />and comment pursuant to Stipulation III, along with FTA notification. The 90% <br />and 100% Project plans and any modifications to the 100% Project plans do not <br />need to be submitted to the Consulting Parties unless the Metropolitan Council or <br />FTA is requesting additional feedback on`the design of specific Project elements, <br />or if a Consulting Party so requests. <br />iii. If Project construction has begun and a modification of the. 100% Project plans is <br />within 100 feet of a known historic property, the Metropolitan Council shall not <br />Rush Line BRT 54 USC § 306 I08 MOA 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.