My WebLink
|
Help
|
About
|
Sign Out
Home
2008 COMPREHENSIVE PLAN
GemLake
>
PLANNING
>
COMPREHENSIVE PLANS
>
2008 COMPREHENSIVE PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2025 11:00:18 AM
Creation date
12/30/2025 10:56:20 AM
Metadata
Fields
Template:
Planning & Zoning
Code
PLZ 00300
Document
COMPREHENSIVE PLAN
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
Show annotations
View images
View plain text
G. All applicable state or federal requirements for sewage <br />effluent will be met or exceeded. <br />H. Wastewater generation served by ISTSs will be <br />required by the City to connect to the public system <br />within one year of the time service is made available. <br />I. A capital improvements program, which includes <br />sewer system improvements, will be developed. <br />J. Minimum lot sizes adequate to provide for all expected <br />improvements to ISTSs will be required. This will <br />allow for the installation of two ISTSs, in order to <br />insure space for an alternate system or system <br />expansion, in case of inadequacy or failure. <br />K. A continuing education program on the function and <br />maintenance of ISTSs will be established. <br />L. Outside funding sources for programs to locate and <br />upgrade substandard wells and ISTSs will be sought. <br />City of Gem Lake Comprehensive Plan I page 7-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.