My WebLink
|
Help
|
About
|
Sign Out
Home
2019 08-06 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2010 - 2019
>
2019
>
2019 08-06 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2026 3:31:26 PM
Creation date
1/5/2026 9:10:38 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
PC MEETING
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
Show annotations
View images
View plain text
MEMORANDUM <br />TO: PLANNING COMMISSION <br />FROM: TOM RIEDESEL�- <br />DATE; SEPTEMBEV8, 2018 <br />SUBJECT: CONSTRUCTION OF A WAREHOUSE <br />REQUEST' CONDITIONAL USE PERMIT <br />VARIANCES FROM SECTION 9.10.711) AND: 26.4.6 OF THE <br />CONSOLIDATED LAND USE ORDINANCE OR CONSOLIDATED <br />LAND USE ORDIANCE AMENDMENT <br />LOCATION: 36.60 SCHEUNEMAN ROAD <br />APPLICANT: SMITTY JEFFREY OF JEFFREY ENTERPRISES, L.LC <br />FOR POLAR TOOL <br />ZONING: GATEWAY ZONE — NEIGHTBORHOO❑ CENTER <br />Polar Tool is requesting City of Gem Lake approval to construct a storage warehouse <br />at 366.0 Scheuneman Road. Polar recently purchased the site and removed the <br />dilapidated home, which was located on the property.. Their current office/warehouse <br />building is on the abutting property at 3642.Scheuneman Road... <br />The new building is proposed to be 60' x 80' in size with one loading dock and: o.ne <br />drive- in door facing Scheuneman Road. The .building as proposed is a post frame <br />building using corrugated metal siding. A 3' high brick detail has been added to the <br />right-of-way side of the buiIding similar to the fa9.ade an their existing building. A paved <br />driveway, which in. the original proposal was 60' wide, has been red aced in width to.30'. <br />The building is proposed to be 28' high measured from grade to the tip of the roof, A. <br />4:12 pitched roof and one -foot overhangs are proposed. <br />The previous staff memo requested plan updates addressing the following items: <br />topography - topo information is shown on the updated plan received 6/24/19 <br />lighting details - a plan showing 3 wall pack- lights is shown. on the Scheuneman <br />side ofthe building. One light is also planned on the east side <br />• a parking area. with landscaped island - no island is proposed but the entryway <br />has been reduced in width by 30`, creating space for landscaping on the right- <br />of- way side of the property. The area was redesigned to show landscaping <br />is rather than a driveway; the landscaped area where the. driveway was originally <br />proposed could be. considered an island, <br />drainage 0lan. showing best riman8gern ent.0.ractice8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.