My WebLink
|
Help
|
About
|
Sign Out
Home
2018 03-20 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2018
>
2018 03-20 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 4:00:57 PM
Creation date
1/7/2026 3:52:19 PM
Metadata
Fields
Template:
Administration
Code
adm 00500
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
Show annotations
View images
View plain text
18. The developer shall provide copies of all governmental agency permits received to the City <br />of Gem Lake. <br />Response - When Permits are received.., copies will be forwarded to the City of Gem Lake. <br />10. Typical section needs. to clearly defined all widths on sheet 12, and move to street sheets <br />and not erosion control. sheets. Plan still shrews variable .dims and sidewalks on wrong <br />sheet. <br />Response Typical street section details have been updated to define all widths and the <br />sidewalk has been removed. The'typical street detail :has been moved to Street Plan Sheet. <br />20. Plan has been..adjusted to. move stub to MH.1.1, however, bal I2 should. be..moved west <br />slightly to eliminate acute pipe angles at both IM 14 and 12. <br />Response - ,MH 12 has been moved west to eliminate acute.pipe angles. <br />.21. Eliminate unneeded detail plates. <br />Response —. Unneeded. detail plates have been removed .from plans. <br />.22. Prepare and submita. S WPPP and Erosion and Sediment Control Plan. at least as stringent. <br />as the NPDES Construction Stormwater Permit. <br />Response — S WPPP & Erosion Control. plans have been. prepared as part of the NPM <br />permit. application. NPDES Permit # C00048368 <br />23. The existing conditions drainage madel:should.he updated to show existing storage areas, <br />drainage patterns, and flows. Proposed model. should compare to ensure that additional <br />ponding, elimination of flow or nuisance conditions are not created. <br />.Response Existinglpropgsed drainage models have been updated by .4E2S and provided <br />to the. City and the Watershed, <br />24. Show the proposed culvert to drain the west offske discharge in the plans. <br />Response— Proposed culvert has been shown on the plans. The proposed cu.]v.ert,Is located <br />within the proposed 3' ditch to discharge to the west. <br />25. Please use the. appropriate TR-55 methodology: for all drainage areas. Please note that <br />undisturbed offsite area. should :have consistent TGC from the existing to. the proposed. <br />conditions. <br />Please update the tables showing TDC in the narrative. Please address why Drainage.Areas <br />EX 8 and PR-08 have a direct entry TOC of 12 minutes. Please. recognize. the TR-55 <br />minimum value of 0.I hours: (6 minutes).. <br />Response. - Subwatersheds have..been updated to. reflect TR7-5.5 methodology. Tables <br />within the report have been also updated to reflect new Te's. <br />26. A complete wetlandloutlot Operation &. Maintenance. Manual shall 'be prepared and <br />submitted.. Gem Lake` shall be copied on all. wetland monitoring reports. submitted to <br />RWMWD. <br />Response � Wetland Operation & Maintenance. Manual to: be prepared by Kjolhaug <br />Environment Services,. Inc. The City of Gem Lake will be copied. on wetland monitoring <br />reports that are submitted .to RWMWD. <br />27.. Stormwater ponds shall be maintained by the developer until the project is complete (all <br />homes finished) at which time the. City of Gem Take will. take over. maintenance. Wetland <br />creation areas shall be maintained by the developer until establish and turned over to the <br />homeowners association upon establishment ofthe wetland and vegetation. Developer to <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.