Laserfiche WebLink
submit a maintenance agreement and Maintenance Plan for.ali stormwater facilities and <br />wetland mitigation areas. <br />Response .Maintenance agreement Js.being put together by AE2S and will be. submitted <br />to the City of Gem Lake and RWMWD. <br />28. Proposed drainage plan appears to modify drainage :patterns across watershed. district <br />boundaries. Although this project doesn't occur in the VLAWMG district, the project <br />intercepts flow from VLAWNIO and changes flow back to VLAWMD. Notification shall <br />be made to both agencies and ,proof of approval shall be. submitted from both that drainage <br />to adjacent.properties has not been adversely affected or created. <br />Response — The plans and stormwater management plan have been submitted to <br />VLAWMO and they will differ to RWMWD for the project review. <br />29. Include construction notes related to.`infiltration at least as. stringent as those listed. in the <br />MPCA's NPDES Construction. Stormwater Permit and the Minnesota Stormwater Manual. <br />Response - Infiltration notes have been -added to sheet 11:, which includes the requirements <br />as stated in the NPDES permit section III.D.I I. <br />30. Plan to show details on infiltration basin section, berm crass -section etc. <br />Response - germ cross-sectionhas been shown on plans. Infiltration basin section has <br />been shown on the plans. (5ee.sheet 11) <br />3.1 No street lights shall. be installed within.the Villas of Gem Lake development. <br />Response - No street lights have been proposed to be installed within the Villas of Gem <br />lake development. <br />.4 <br />