Laserfiche WebLink
Villas of Gem Lake, Gem Lake, MN <br />A Medium quality. rated wet meadow plant community will he.composed..of 5 to 9 species of <br />native grasses,. sedges,.rushes, ferns and/or forbs; anchor invasive herbaceous species treed <br />canary grass; purple loosestrife) :cumulatively cormprise.20 to 50 percent cover; andlar non-native <br />buckthorns; comprise 10 to 30.percent cover within the wet meadow. community.. <br />Seasonally flooded basins may be devoid of vegetation (i.e., mud flats), may contain annual <br />wetland species with percent coverages.that vary from year to year,. or may establish perennial <br />wet Meadow vegetation over time. <br />Tareet Hydrology <br />Visual. observations of hydralogy:(primary and secondary indicators) will be observed.and <br />documented. <br />Established: Upla.nd Buffer Performance Standard <br />Target vegetation shall consist of 70 percent vegetative aerial cover of native/non-invasive <br />perennial species with three or more dominant species of native/non-invasive grasses and/or <br />forbs as determined by the. 50120 rule. <br />Preserved Woodland Suffer Performance Standard <br />Target vegetation shall consist of the existing native tree canopy. The shrub/herbaceous layer <br />should not contain more than 50% invasive species. <br />4. REPLACEMENT AREA/WETLAND MONITORING PLAN. <br />The replacement wetlands. and: upland buffer will be monitored for five years or until the Local <br />Governmental Unit determines that the goals of the wetland replacement plan have been <br />sufficiently met and monitoring is no longer neededin accordance: with Minnesota Rules. <br />8420.0810, 5ubp. 4. Monitoring activities. will include: <br />• The replacement areas will. be monitored during construction to ensure the wetland <br />creation/enhancement. is completed in a manner consistent with approved plans. Upon <br />the completion of construction activities, as as7built survey will be prepared (by others) <br />and compared with the approved plan. Deviations from the plan.wi11 be corrected if <br />necessary, or retained is acceptable to the TEP and L:GU. <br />+ After approval of the as -built construction survey, the wetland/buffer will. be. prepared <br />and seeded as described in the .vegetation plan. Upon completion of seed installation, a <br />Ate visit will be. conducted with the revegetation service provider to confirm seeding was <br />consistent with the, approved -plan. <br />* Beginning the growing season after fall. seeding, monitoring will begin to evaluate the <br />development of the wetlands and. newly established upland buffer. Monitoring will be <br />conducted for 5 years or. longer is necessary, until. the wetlands and buffers. are <br />determined. to be fully established. Approximately 5 site visits will be completed. <br />annually, with one early in the growing season (May), one in late (October) and 3 spaced <br />❑ufi approximately equally between the first and.last visits. <br />