My WebLink
|
Help
|
About
|
Sign Out
Home
2018 04-17 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2018
>
2018 04-17 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 4:00:57 PM
Creation date
1/7/2026 3:57:31 PM
Metadata
Fields
Template:
Administration
Code
adm 00500
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
Show annotations
View images
View plain text
and a single water main connection and extensions in the general vicinity of <br />County Road E.and English Street to serve the Villas: The project -in cludes north. <br />ward extension oft he Vadnais Heights water main. and sanitary sewer beneath <br />County Road E.. A valve, meter pit and meter. for water utility will be required <br />near the north right of way line of County Road E. Thespecific. locations and <br />methods;.af connections to. the`Vadnais Heights' sanitary sewer and water. mains <br />sball.be approved: by the Vadnais Heights City. Engineer. The.water valve:and <br />meter shall be.within reinforced concrete:marthole. to measure.the usage of water <br />from the Villas. <br />In the event that the property east .Of DanieIs Road is considered for <br />future development in Gem Lake, the City. of Gem Lake will plan for <br />access to County Road E to the intersection of International Drive. <br />Ramsey County.has provided correspondence dated September 15.,:2617, <br />autlining.that. a road connection toward International Drive must be <br />accommodated and planned for the future. <br />The. Developer shall deed Qutiot.A to the City of Gem Lake for trial and <br />parks, drainage and utility.purposes and. to. ere ate . a future: public rig ht-b& <br />way between the roadway in the dcve.lapment and Daniels -Farm Road, if <br />required by the City of Gem Lake. The future right-of-way if required, <br />shall. be located at. the northeast corner of Outlot. A as shown on the <br />plans. <br />3.. Plan s_and Spet if,catidns -- Gem Lake, at its sole cost; shall be responsible for <br />preparing plans and. specifications and for administering the project. Project. <br />plans and sp ecifi cati on s. shal I insure that appropriate metering devices will: <br />be installed: Project plans and specifications shall be approved by the <br />Vadnais Heights City Engineer prior.to the start.of construction. All State <br />plumbing.codes must. be. .ruetfor individual house connections.to utilities. <br />No sump pump discharge can be directed to the sanitary sewer.system. <br />C..-Co nstructignof Project -- Gem Lake; at its sole cost,.shall constrict the <br />project.pursuant to the approved final plans. All uti I ity wort: must be <br />constructed by a licensed and. bonded contractor capable of completing the <br />work. All improvements must be inspected byGem:Lake or its designated <br />professionals to insure. the approved plans are met. Vadnais Heights <br />representatives shali be.invited.to the .preconstruction ntceting, allowed to <br />iiispect the project at reasonable.times during the period of construction, <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.