Laserfiche WebLink
1/18/2022 <br />Water Availability <br />• White Bear Lake <br />— ADD and MDD are 2A MGD and 5.1 MGD respectively (not expected <br />to.iincrease through 2040) <br />— Firm production .capacity of 7.42 MGD <br />Storage capacity of 5 million gallons, as well as a Water <br />Appropriations PerWell-as <br />to pump an average o3,15 MGD. <br />— White Bear Lake.water system has excess capacity and should <br />be able to supply Gem Lake's estimated ADD of 0.15 MGD. and MDD <br />of 0.46 MGD, <br />5l H 2udomria'1.90;61 Wei 'Id frif ,l10 Ve— <br />Water Availability <br />White Bear Township (North System) <br />— 2022 ADD and MDD -are 1.562 MGD and 6.065 MGD respectively <br />— Estimated 2040 ADD and MDD are 1.68. MGD and 6.52 MGD <br />respectively <br />— As of 2018, Water Appropriations Permit..to pump an average of 1.51 <br />MGDin the North System, which is just shy of the estimated ADD <br />Need cfaAi6jtion of appropriations permlivso ADD. <br />- Firm production capacity of 4.39 MGD (6.55 MGD Total capacity) <br />White Bear Township water system fbay require increased Water <br />Appropriations. Permit limit and additional capacity to be able to <br />supply Gem Lake <br />Further discuss ion slclarifrcationsvwlh White &arTawnship are recommended <br />if Gem Lakeyishes to proceed VA. White Bear Township supr;lled <br />distribution system <br />SEH L,ilq rn a k7 al t4•.i ': na1•11 =!I:.I lja <br />YIJ <br />5 <br />