My WebLink
|
Help
|
About
|
Sign Out
Home
2022 01-18 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2022
>
2022 01-18 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 7:49:53 AM
Creation date
1/8/2026 7:42:49 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
Show annotations
View images
View plain text
1/18/2022 <br />Hydraulic modeling <br />• Assdrnptions/Modeled Conditions <br />— Gem Lake. served from a single connection to either White.Bear Lake <br />or White Bear Township <br />• Worst case .scanano !or modelingievaluation purposes <br />Multiple conneclions to whichever City will be supplying water are <br />recommended (to be further explored in subsequent design phases) to <br />provide redundancy and operational flexibility. <br />— All service connections within the City to be fed from new city-wide <br />water distribution. system <br />Existing servicescurrendyfed by other communities are assumed.to be <br />replaeed'wtth new service connections as required <br />— Residential. demand was split evenly.airmng the 216 residential <br />parcels <br />-- Land use based demands were spread evenly among.each.parcel. in <br />localized areas. <br />— Target.system pressures in range of 35 psi to 80 psi <br />— Pipe velocities less than 5 feet per second <br />— Adequate fire protection flows <br />SEH ,:._....._ .� <br />11 <br />Hydraulic Modeling <br />• Loop based distribution system essentially the same for <br />either White Bear Lake or White Bear Twp. Connection <br />— lntemal demand values and locations some for either scenario <br />White Bear Lake Connection Findings <br />— White Bear Lake. -can provide adequate pressures, with the lowest <br />pressures seen at higher elevation areas to the. west <br />While one watermain :crossing of Hwy 61 could provide adequate <br />fire flows, if the empty agriculture lotto the west assigned as mixed <br />use should develop, two crossings recommerlded.to increase <br />available fire flow to at least2,OQ0. gpm <br />White Bear Twp. Connection Findings <br />— Due to low hyd'raulfc.grade line (low pressures) experienced. within <br />White Bear Township, a.pressure booster station likely required <br />to provide adequate pressures <br />— Pressure booster station needed to provide adequate fire flows <br />f� <br />SEH s::rU;q:aiv:K,•.ro!drar xr„us° <br />12 <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.