My WebLink
|
Help
|
About
|
Sign Out
Home
2022 01-18 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2022
>
2022 01-18 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 7:49:53 AM
Creation date
1/8/2026 7:42:49 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
Show annotations
View images
View plain text
Well <br />Well #3 <br />Capacity.. <br />.. <br />2,400 <br />3.46 <br />Well #4 <br />2,570 <br />3.70 <br />Total Capacity <br />7,720 <br />11.12 <br />Firm Capacity <br />5,150 <br />7.42 <br />Note: Well #5 is listed as an emergency use only well. <br />Source: White Bear Lake Water Supply Plan <br />Table 3 — White Bear Lake Storage CapacP <br />Storage <br />Centerville Road <br />,. <br />1 million <br />Century Avenue <br />3 million <br />Clearwell <br />Total Capacity <br />1 million <br />5 million <br />White Bear Lake's Water Supply Plan states that their existing ADD and MDD are 2.4 MGD <br />and 5.1 MGD respectively and that additional demands are not expected through 2040. <br />According to the Minnesota Department of Resources (DNR), as of 2018 White Bear <br />Lake's Water Appropriations Permit allows them to pump 1.150 million gallons per year <br />(MGY) or an average of 3.15 MGD. <br />With a firm capacity of 7.42 MGD and an MDD of 5.1 MGD projected through 2040. a <br />storage capacity of 5 million gallons, as well as a permit to pump an average of 3.15 MGD, <br />the White Bear Lake water system has excess capacity and should be able to supply Gem <br />Lake's estimated ADD of 0.152 MGD and MDD of 0.456 MGD. <br />2.3.2 White Bear Tovirshin W r Availability <br />White Bear Township has a total of six wells, with two of those wells serving the South <br />System. In this study, the North System was explored as being a potential source for Gem <br />Lake as it is the largest system and borders the City of Gem Lake. <br />FEASIBILITY STUDY UPDATE <br />Table 4 White Bear Township North System Supply Capacity <br />Well #3 <br />CapacityWell <br />.. <br />1,200 <br />.. <br />I 1.73 <br />Well #4 <br />650 <br />0.94 <br />Well #5 <br />1,200 <br />1.73 <br />Well #6 <br />1,500 <br />2.16 <br />Total Capacity <br />4,550 <br />6.55 <br />Firm Capacity <br />3,050 <br />4.39 <br />Source: White Bear Township Water Supply Plan <br />Page 5 <br />City of Gem Lake, MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.