My WebLink
|
Help
|
About
|
Sign Out
Home
2018 09-18 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2018
>
2018 09-18 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2026 4:00:57 PM
Creation date
1/8/2026 7:43:42 AM
Metadata
Fields
Template:
Administration
Code
adm 00500
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
Show annotations
View images
View plain text
a C-Store - Preliminary Site Plan Reylew <br />29; 201 a <br />2 <br />.J. Language should be added to the agreement. that Hyvee or landowner will be required to work with the <br />Clty regarding this land once the adJacent parcels are redeveloped; Potentially, the access points to the <br />development may need to change or be revised. Additionally,. we may need this space to take additional <br />storm Water from the .roadway or other.development and the City should have access to the space to do. <br />so, This means the developer shall overdesign the stormwater management features on the site to <br />account for additional run off that what their currentdesign shows. <br />k. It is recommended that the City consider negotiations regarding this land. such as: <br />Requirementfor thedeveloper. to extend. the City watermain. down .Hoffman Road to the <br />south.property line of the. parcel. This will prevent shut down of the new development <br />When the time cornea to extend further and provide additional fire protection In Way of an <br />add.ltlonal hydrant. <br />— Additionally, City may need this space to take additional storm water from the roadway or <br />other development and the City should have access to the space to do so. This means <br />the developer shall overdeslgn and enlarge the stormwater management features. on the <br />sl#e to account for additional run off. More than what their current design shows, <br />21 Currently there are ponds, landscaping; utilities, drive through lane, :and berms planned between the two <br />driveways appears to be in the public right-ofway. The city's design standards do not allow this. <br />3 More discussion IS needed bn the water service connection location to avoid future shut downswhen the City <br />main is extended. <br />41 They need. to submit the. BIVII? maintenance plan before.the development plan .is approved by the City, not <br />I after:. <br />.8.1 Landscape plan needs to Include the irrigation plan and details before plans can be reviewed and approved, <br />61. A.nraftSite Plan has been provided to the. City and ta: the County showing. an additional 25' of RIW given to <br />the County along CR E and a turn ia.ne and trail being: constructed. This is approved by the. County and City <br />Englneer.. <br />7' Plan approval for construction is subject:to all review comments provided by :ihe..City Engineer fry the Excel <br />spreadsheet.are addressed and satisfied. <br />i Jmm <br />i;gchment <br />Olgamlklcac .=Vn y-vae davaimmenrihyvee store development reNew memo a•23-1a,daca <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.