My WebLink
|
Help
|
About
|
Sign Out
Home
2022 03-15 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2022
>
2022 03-15 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 7:53:50 AM
Creation date
1/8/2026 7:49:53 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
Show annotations
View images
View plain text
I The applicant is required to acquire abuilding permit from the city forthe proposed structure and to submit <br />a grading and erosion control plati tb'eity staff for review prior to. issuance.of a building permit; so as to <br />ensure drainage issues are mitigated. <br />3. The applicant would not be allowed to turn this structure. into a secondary -residence on the property and <br />would icmbdel the. existing -nearby shed to match the sidittg.9f..the-new garage.wiihin-9pe year of garage <br />completion, <br />4. Any connediotis'ofthe proposed. accessory structure-te. city utilities woulii.adhere to applicable city <br />requirements. <br />5. The applicant is required to adhere to all applicable local, State or Federal regulations. <br />6. The applicant is required to acquire any other applicable local, State or Federalpermits for this:request: <br />New Business <br />Luther Cadillac Project Request and Anticipated R"pphcation <br />An.application for a new car dealership.that spanned two cities (Oeih%Lake and Vadnais Heights) was approved. in <br />2019. Due to the pandernic and other factors, the project.had td be'put on hold f6r a period of time. Luther.Cadillac. <br />now wishes to restart -:the project with:'slightly revised plans. The project involved a car dealership and large parking <br />lot. The building would be -entirely -in Vadnais Heights. The..north end of the: parking lot.would be in Gem Lake. <br />Revised plans were shownto:the.Planning Commission by Steve. Sabraski of Land.Form Company.; who is <br />managing the construction planning: The -new plans.show.a-smaller sales building that is set back. further from <br />Highway 61 and the access road: The parking. lot is essentially the same; although revisions allowed for the <br />elimination of the retaining viall and tho.ihstallation of more landscape sereeningon the north end of the project. <br />Commisaiori members asked several questions but generally regarded the plans as essentially the same as those <br />approveii-three years ago for thatportion of the project that is in: Gem Lake. Sabraski added that. Vadttais Heights <br />had already approved the revisions and that Luther was ready to startin March or whenever Gem Lake could - <br />provide their dfftcial stamp of approval. He added that watershed. approval had already been obtained. The ' <br />application will be sent into the city in the coming week. (t.wilI be. the subject of a publie*hWing on April t.2, with - <br />council .discussion and potential approval on April 19.: <br />202b-Gem Lake Comprehensive Plan <br />A final draft of the Gem. Lake Comprehensive Plan was.submitted to the 11+Ietropolitan.Council appMximaoely one <br />year ago, following a.public. hearing. In December of 2021,.a letter was.received back1om the*Metropo,[itan <br />Council:: asking for additional changes. The: consultant working on this project forthe-City, did Mt:feel the -changes <br />were significant and could .be. completed fairly quickly. One .or two .of the requested.changes involved the City's <br />engineering .firm. -SEH is currently seeking clarification from.* Metropolitan Council on one or two of the requests <br />for revision.. <br />Once the final version is re -submitted to the Metropolitan Council;.Artig-Swomleyand . Cummings discussed ]laving <br />a joint informational meeting on the. plan. This informational meeting could be part of.the April or May City Couddil <br />meeting. April is preferred if the timing can be managed. Artig=Swonnley said she would get in touoh -witli the; <br />consultantwho helped write the plan and..soelfhe-is-aVailable.on April 1.9 <br />Future Meetines <br />City Council Meeting, April 12, 2= at Heritage.Hall. This meeting will include a public-heaft on.the Luther <br />Cadillac�application: <br />A419u'rnment <br />Belitgthere-no fttrther.business, following a :motion from Patrick, seconded by Farrell; the meeting adjourned at 8:05 <br />p:m. <br />:RespectfWlys:tbmttted, Gretchen Artig SWmley <br />Cityof Gein Lakc Planning Commission Meeting Minutes March 8, 2022 211' a g L. <br />
The URL can be used to link to this page
Your browser does not support the video tag.