My WebLink
|
Help
|
About
|
Sign Out
Home
2018 09-04 PC PACKET
GemLake
>
PLANNING
>
PACKETS
>
2010 - 2019
>
2018
>
2018 09-04 PC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 8:22:25 AM
Creation date
1/8/2026 8:17:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
Show annotations
View images
View plain text
e CmStore = Preliminary Site flan Review <br />29, 2018 <br />z <br />Language should be. added to the agreement that Hyvee. or landowner will be required to work with the <br />Cityregarding this land once the adjacent parcels are redeveloped, Potentially, the access points to the <br />development may need to change or be revised, Additionally, we may need this space to take additional <br />storm water from. the roadway or other development and. the City should have access to the space to do <br />so. This means the developer shall overdesign the storm.water management features on the site to <br />account for. additional run off that.what their current. design shows. <br />k, it is recommended that the City consider negotlat€ons regardingthis land.such as: <br />' Requirement. for the developer to extend the City watermain .down Hoffman Road to the <br />i. south property line of the parcel. This will prevent shut down .of the new development <br />when the time conies to extend further and provide additional fire protection in way of an <br />- additional hydrant. <br />Additionally, City may need this space to take additional storm water from.1he roadway or <br />1 other development.and the City should have access to the space to do so, This means. <br />I thedeveloper shall overdesign. and enlarge .the stormwater management features on the <br />site to account for additional run off. More than what their current design shows, <br />2' Currently there are ponds, landscaping, utilifies; drive through lane, and berms planned between the two <br />'. driveways appears to. be in the public right-of-way. The city's. design. standards do not allow this. <br />3: More discussion is needed on the water service connection location. to avoid future shut downs when the City <br />! main is extended. <br />4j They need to submit the SMP maintenance plan: before the development plan Is approved by the C[ty, hot <br />f after. <br />5; Landscape: plan needs to include the'Irrigation plan and details before plans can be reviewed and approved. <br />6i. A Draft Site Plan has been provided.to.the City and to the County showing an.additional.25' of RNV given to <br />the.County along CR E and a turn lane and trail being constructed. This is approved by the County and City <br />I Engineer. <br />7E Plan approval for constriction is subject to all review comments provided by [he City Engineer in the. Excel <br />I spreadsheet are addressed and satisfied.. <br />Jmg <br />nt. <br />nmon*wae developmsnnhyvee s.W4t development review men-6 U-23.15.110Cx <br />
The URL can be used to link to this page
Your browser does not support the video tag.