My WebLink
|
Help
|
About
|
Sign Out
Home
2022 09-12 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2022
>
2022 09-12 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2026 8:23:31 AM
Creation date
1/8/2026 8:17:23 AM
Metadata
Fields
Template:
Administration
Code
ADM 05000
Document
CITY COUNCIL PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
Show annotations
View images
View plain text
9/12/2022 <br />Potential Water System Needs <br />• Existing Conditions <br />- Majority of residents on private wells <br />- Recent MPCA and MDH sampling for 1,4-dioxane, a <br />likely human carcinogen, found levels above the <br />MDH health -based guidance value in some private <br />wells <br />• Municipal Water Supply Feasibility Study update <br />completed to evaluate potential options for providing <br />safe and reliable drinking water to residents <br />SPA Nita td a thY IaAfl ti <br />Potential Water System Needs <br />• Municipal Water Supply Feasibility Study evaluated <br />the following options: <br />A centralized water distribution system <br />• Serving the entirety of Gem Lake with water supplied solely <br />from one of the neighboring community water systems <br />- Options for smaller, localized water supply projects <br />• Could be phased to provide water service to portions of the <br />City with known well water quality concerns <br />Al <br />SFh hweaMeMll AlaW <br />Potential Water System Needs <br />• Centralized water distribution system options <br />Sconano Opin on of Probable <br />Construction Cost <br />Centralized Distribution System — $10,455.6,114111 <br />White Bear Lake Connection <br />Centralized Distribution System — $10,965,834 <br />White Bear Township Connection <br />Not- <br />(1) Estimated costs are Gees 4 Feasibility Estimates as defined by MCE cost <br />estx n ile dassilcation system. with an expected accuracy range of -30%to <br />+50%based on project definition (up to 15 % complete design) level <br />analysis. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.