Laserfiche WebLink
9/12/2022 <br />Potential Water System Needs <br />• Localized water supply options <br />Priority Level 1 Service Area - Option 1 $2.261,030 <br />Priority Level 2 Service Area - Option 1 $2.771,100 <br />($5,032,130 cumulative) <br />Pnonty Level 3 Service Area - Option 1 $367.022 <br />($5,399,152 cumulative) <br />Notes: <br />(1) Esbmated costs we Cass 4 Feasibiity Estimates as defined by AACE cost <br />estimate classificatwn system. <br />(2) Cumulative costs for service areas vrdude cost of lower priority areas <br />Potential Water System Needs <br />• Localized water stlonly ontions <br />Priority Level 1 Service Area - Option 2 $3,478.076 <br />Priority Level 2 Service Area - Option 2 $2,487.614 <br />(35,965,690 cumulative) <br />Priority Level 3 Service Area - Option 2 $478.821 <br />($6,444,511 cumulative) <br />Notes. <br />(1) Estimated costs are Class 4 Feasibility Estimates as defined by AACE cost <br />estimate ctassife:aeon system. <br />(2) Cumulative cosm for service areas include cost of lower priority areas <br />3 <br />