Laserfiche WebLink
(4) The, licensed installer shall be responsible for notifying the departnicrit a minimum <br />of twenty four (24) hours before the time the work is ready for inspection or <br />reinspection. <br />(5.) When; upon inspection, any part of the systenxi is determined not to be its compliance <br />with this division, written notice shall be provided by the Department indicating <br />the deficiency and the required. corrections. <br />(6) Noted deficiencies shall be properly corrected and reinspected before any other <br />work oil the project is continued. <br />(7) SSTS found not to be in compliance with Minnesota Rules, Chapter 7080.1.500, <br />Subd.. 4A or Chapter 7081..0080, Subd. 3 must be repaired or replaced within ten <br />(10) months. <br />(8) No system shall be placed or replaced in service until final inspection. and approval <br />of the installation. <br />(9). The contractor, upon completion of the installation, shall file with. the departntcnt <br />as --built drawings indicating the location of system components dimensioned from <br />a permanent reference. point. <br />(10) A minimum of three construction inspections are required for mounds in <br />accordance with the following: <br />a: When the..original soil under the. mound. has been roughened. but prior to <br />placement of the sand fill. Enough of the.. proposed sand fiII must be.present to be <br />viewed. <br />b.. After placement of rock and piping but prior to cover. <br />c. Final inspection, when the job is completed. <br />(11) SSTS that are determined to have operation or monitoring deficiencies. most <br />immediately be maintained, monitored or otherwise managed according to the <br />operating permit. <br />(12) A Certificate of Compliance for new SSTS construction or replacement shall be <br />issued by the Departnient if the Department has reasonable assurance that dic <br />system was built in accordance with the applicable requirements as specified in the <br />construction permit., <br />(13) The Certificate of Compliance must include a certified statement by the se. <br />ptevidfr,or qualified.ctriployee who conducted the.inspection that the SSTS is or k <br />not in compliance with the Ordinance requirements. If the SSTS is determined not <br />to be in .compliance with the applicable requirements, a Notice. of Noncompliance <br />must be issued to the owner which includes a statement specifying those 0rdinnee <br />provisions with which the SSTS does not comply. <br />(14) The Certificate of Compliance or Notice of Noncompliance must. be submitted to <br />the Department no later than fifteen (15) calendar days after'the date the inspection <br />was performed. The Department shall deliver the Certificate of Compliance or }. <br />Notice of Noncompliance to the owner. or the owncr's agent within fifteen (1 S) ` <br />calendar days of receipt from the.�s. . er or qualified esnployee, No SSTS <br />shall be placed into operation until. a valid certificated of compliance. has been <br />issued. <br />(15) Certificates of Compl iance for new construction or replacement shall ren-luin valid <br />.for five: (5) .years from the date of issue unless the Department finds evidence of - <br />noncompliance, <br />1$ <br />