3.4 <br />2 <br />5 <br />7 <br />Water Supply Study identify the. -extension of water main in Scheuneman Road, north of State <br />Highway 61 asa potential route formunicipal water service to the northeast portion of the City. <br />The proposed improvements will be designed with this future extension urider .State Highway 61 <br />in mind. <br />Storm Sewer/Drainage <br />The existing c.enterline culvert near the mid -point of Scheuneman Road will be replaced as part <br />of these improvements. The new culvert will be. Reinforced. Concrete (RCP) and will have aprons <br />and riprap on eac.h end.. The existing ditches thsat currently collect and transport drainage to this <br />low point will be replaced with a new storm sewer system. The new system will be sized to <br />handle. a 10-year drainage event, The new..storm sewer system will consist of catch basins to <br />collect the runoff and RCP pipe to convey the`runoff to the low point. At the low point it it <br />recommended to install a treatment basin on the west side of Scheuneman Road to.retain and <br />treat the surface. runoff before it goes west, ultimately towards Gem take. The proposed <br />treatment basin will likely require a permanent easement besecured. from the adjacent parcels). <br />See Figure 3 for the:proposed storm sewer improvements. <br />Other Utilities <br />The proposed improvements will be coordinated with private utility companies so that future. <br />disruptions to the newly constructed street could be avoided. <br />Right -of -Way and Easements <br />The construction limits of this project are anticipated to fall within the existing right-of-way of the <br />project road with the exception of the two small proposed easementareas along County Road. E, <br />as shown on Figure 3. To provide sufficient room for a. storm water treatment area, it is <br />recommended. to provide easements as shown on Figure S. Easement costs are not included onf <br />the project costs. <br />Permits and Approvals <br />The following permits and approvals will need to. be obtained for this project: <br />Minnesota Department of Health (water main extension). <br />■ Minnesota Pollution Control Agency (sanitary sewer extension). <br />Minnesota Pollution. Control Agency (turf disturbance if greater than 1 acre) — NPDES. <br />Minnesota Department of Transportation. (work in right-of-way). <br />Estimated Coss <br />The total estimated project cost of the improvements. outlined in broken out by project. piece and <br />summarized below: <br />Street Improvements <br />$617,240 <br />Sanitary Sewer. Improvements <br />$69;550 <br />Water Main improvements <br />$163,280 <br />Total <br />$850,070 <br />FEASIBILITY STUDY G! &K:143869 <br />Page'3 <br />