Laserfiche WebLink
$500,001.00 to $1,000,000.00 <br />$3,886.65. for the first $500,000.00 plus $5.50 for each additional $1,000.001, <br />or fraction thereof, to and including $1,000,000.00 <br />$IfOOO,001.00 and up <br />$6,636.65 for the first $1,000,000.00 plus $4.50 for each additional $1,000.00,. <br />or fraction thereof <br />Burning_ Permit: <br />No charge (limit one per address) <br />CiV Engineer Fee; <br />Actual cost <br />Commercial Resurfacing Fees: <br />Contractor License Fee: <br />$100.00 <br />Plan Review Fee: <br />_ 2% of project. valuation <br />Soil erosion inspection: <br />$200.00 fee if Over an acre <br />If over one acre: <br />NPDS permit from the Minnesota Pollution Control Agency <br />Actual cost <br />Demolition Permit: <br />Residential: <br />$250.00 <br />Commercial: <br />$700.00 <br />Driveway Permit: <br />$50.00 <br />Fence Permit: <br />$50.00 <br />Fire. Inspections- <br />s <br />$I00.00 per unit UnclUdes f ollow-lap} <br />3 <br />