My WebLink
|
Help
|
About
|
Sign Out
Home
2026 02-17 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2026
>
2026 02-17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2026 7:48:22 AM
Creation date
2/17/2026 8:48:22 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKETS
Destruction
PERMANENT
Text box
ID:
1
Creator:
METRO-INET\BARBARA.SUCIU
Created:
2/17/2026 11:48 AM
Modified:
2/17/2026 11:48 AM
Text:
mailto:pcorey@neielectric.com
ID:
2
Creator:
METRO-INET\BARBARA.SUCIU
Created:
2/17/2026 11:48 AM
Modified:
2/17/2026 11:48 AM
Text:
http://www.neielectric.com/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
Show annotations
View images
View plain text
45-KVA Option – 100 amps for building operations <br />Included: <br />•45-KVA 3-Phase Diesel Generator or Natural Gas equivalent <br />•400-amp Nema 3R service rated Automatic Transfer Switch <br />•Include Saw-Cutting & Replacement of Concrete Sidewalk to Allow for Conduit Run to Generator. <br />•Supply & Install Concrete Pad for Generator <br />•Rework Existing Electrical Panel to be fed from transfer switch <br />•Supply Permit & Inspection. <br />•Locates <br />Exclusions: <br />•Painting <br />•Premium time <br />•Utility fee’s <br />•Site restoration beyond leveling and seeding <br />Total Cost 45-KVA Generator: $80,930.00 <br />Thank you for the opportunity to provide this estimate. If you have any questions or need additional <br />information, please call me at 612-449-0896 <br />Connect with the Best … Connect with NEI Electric <br />Regards, <br />Tony Reed <br />NEI Electric . 4815 White Bear Pkwy . St Paul, MN 55110 <br />651.771.1000 office . 651.771.9119 . fax <br />email . www.neielectric.com
The URL can be used to link to this page
Your browser does not support the video tag.