My WebLink
|
Help
|
About
|
Sign Out
Home
2019 03-19 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2019
>
2019 03-19 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 8:47:32 AM
Creation date
2/26/2026 8:45:57 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
Show annotations
View images
View plain text
INDEPENDENT CONTRACTOR AGREEMENT <br />FOR METER -READING <br />This Independent. Contractor Agreemer4tis..entered into this 10 day of March, 24L-9, by <br />and between the City.of Gem.Lake("City"), a political subdivision of the:State- of Minnesota and <br />Raymond J. Tessier,. an1ndependent Contractor ("Contcaato?j of the Countyof Ramsey, State <br />of Minnesota. <br />WHEREAS,. the City -desires to engage a contractor to perform Meter Reading Services <br />within the boundaries.oft e.-City.. <br />WHEREAS, the Contractor has represented that it has the skill and resources to perform <br />the Meter Reading. Services. <br />NOW, THEREFORE, in consideration of the mutual covenants and stipulativns-set. <br />forth herein, the receipt and. Adiency of which are hereby acknowledged, the Parties hereto <br />agree as follows: <br />I, ScM of Services. <br />A. The Contractor shall,. on a 4uarterly*basi9, read and record the metefreading of <br />each customer's water meter of the City included in.the assigned meter reading <br />schedule. Said.reading.would take place at the beginning of the quarter for <br />approximately d consecutive days. The readings -taken from the respective meters <br />shall be recorded on.a.handheld.device provided by. the City to the Contractor.. <br />The Contractor must complete all scheduled metefreadings within. the allotted <br />time noted on the meter reading schedule. The Contractor shall notify the. City of <br />any scheduled absences that. may -affect coinpietion of the scheduled-ieasding: <br />B. The Contractor shall record meter readings -only after a physical observatioiils <br />made of the meter. Estimated readings will -not be acceptable. If the: Contractor is <br />unable to physically observe a meter, contractor must ;reportIt.to *pApity and an <br />appointment will be made by the City to secure a read. <br />11. Payment. <br />The Contractor shall: be paid hourly $15.00 after read accurately per quarter, which shall <br />be paid after allJtgWfed readings are submitted. <br />I.11. Phy is eft. Yit for Working Conditions. <br />The Contractor shall represent they are.fit. for working conditions such as time spent <br />outdoors to read meters:involve-continuous.walking, exposure to temperature <br />extremes and adverse weather conditions. Uses a variety of physical movements such <br />as bending/stooping .and..erpuchfiW.kneeling. Tha Contractor knows they may be <br />exposed to. dogs and*livo electricity While meter.readin$.. <br />IV. Time when duties are performed_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.