My WebLink
|
Help
|
About
|
Sign Out
Home
2019 05-21 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2019
>
2019 05-21 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 8:52:35 AM
Creation date
2/26/2026 8:50:17 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
Show annotations
View images
View plain text
Conditional Use Permit A lication <br />City of Gem Lake, Minnesota <br />4200 Otter Lake Road, Gem take, MN 55M <br />651 747-2790192—tax 651 747-2795 <br />cibLfti nlakemn.org <br />A Conditional Ilse Permit maybe granted or denied by the City CosMcil after recommendation by tile Planning <br />Commission in accordance with Ordinance No.131 (zoning), Section 17.5. Conditional and Interim. Use <br />Permits. <br />Applicant: Linda McGinly on behalf of The Luther Company <br />Owner phone/cell/Business: 952.258.8814 <br />email: Lihda.McGin luthetauto.com <br />4Luther Com an LLLP <br />Properiy.�wner: P Y• <br />Site address: 3516 Highway 61, Gem Lake, MN 55110 <br />PropoM*Ja*zoned.as:- *G-NC Existing use of the site: <br />Residential. <br />Description of Conditional Use being requested: <br />Mare re— roval to allow an ap Wmotive--dealership-fhat ',; ex�dibg into <br />-Gem Lake from. an <br />abuttin co� nturd adnais Hei ghts . <br />Fee: Conditional it ePermit (other thfin a PUP.) 06:00 plus $200:60 escrow for review <br />Check list:._ _ <br />❑ Site flan <br />❑ Build inglocations (dwellings, garage, accessory btfAdin&s) <br />❑ Site improvements.(parking areas, drives, sic�ewalks,ler ces, decks, lighting, etc) <br />❑ Yard (front, side, rear setbacks) <br />❑ Wetlands (delineation of streams; water bodies,. wetlands & 100:year storm ele�.ation). <br />❑ Existing trees (6 inch in diameter or more), large shrubs &:proposed landscaping. <br />❑ Location of site, with adjacent land use.. <br />❑ Topography, grading. <br />❑ Schedule (when application intends to construct) <br />❑ Additional information; if required <br />❑ Permits or written comments from. 0her.agencies`(DNR, RCWD, VLAWMO, Ramsey <br />County; MNDot US ArmyCorp¢ of Engineers, <br />❑ Certificate.of Survey or full legal description <br />❑ Building plans (size; intended useof structures., exterior finishes,. floor plans -and. elevations <br />Review Process; <br />1. Submit .15 copies cif application.and all supporting information to City Zoning Administrator. <br />(minimum of four weeks prior to Planning Commission meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.