My WebLink
|
Help
|
About
|
Sign Out
Home
2019 05-21 CC PACKET
GemLake
>
CITY COUNCIL
>
PACKETS
>
2010 - 2019
>
2019
>
2019 05-21 CC PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2026 8:52:35 AM
Creation date
2/26/2026 8:50:17 AM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKETS
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
Show annotations
View images
View plain text
2. Planning Commission: (1A Tuesday of the mouth at 7:00 p.m. at Heritage Hall. Zoning Administrator <br />schedules public hearing. date and provides information to the. White Bear Press for time and place of <br />hearing). <br />(Date of Planning Commission meeting) <br />3. City .Council: (3r Tuesday of the.mohth at7:00 p:m., Heritage Hall, 4200 Otter Lace Road. <br />(Date of the. City Council meeting) <br />Standards: <br />The City Council will approve a Conditional Use Permit only if the following facts:are established: <br />1. There will.be no detraction from the appearance of adjacentproperties, or Town as a whole. <br />2. There will not be.aesthetic.incompatibi.lity. <br />3. There will not be aural incampatibility (noise}. <br />4. There will not ]*`damage to vegetation. <br />5. Traffic patterns will not be negatively affected. <br />6. There is no -unnecessary loss -of existing natural features. <br />7.. Will not cause soiLerosion. <br />8. Will not.inemase flood potential. <br />9: The proposal is consistent with ComprehensikPlan and complies with other -Ordinances. <br />It is :the policy of the. City of Gem Lake -that all identifiable:cotts associated %dtkConditionalUse Permits <br />within the City shall be the sole responsibility of the ownei-of said property. The costs shall include, Nt..are <br />not Iftnited to the following: <br />• City pfanning review costs (reports, meetings,site review); <br />• Engineering review costs; <br />• Legal costs (preparation of hearing notices, legal research, certification costs); <br />• Publication costs (notice of hearing); <br />• Reapportionment of assessments (engineers. report); <br />• Mailings and Ownership Reports (ownership/encumbrance). <br />Prior'to.:the final hearing or determination by the*City CoiuIdL all City:expenses shall be paid by the owner: <br />Subsequent expenses not paid. at the time of final hearing or determination by the City (due to biliingsby <br />consultants, etc.) shall be. paid within 30 days upon receipt of a billing from the City. The application will be <br />consideredincomplete until all costs are..paid to the City. <br />Signature.gf-Applicant.(s) <br />l 4f /7 A <br />Date <br />o be completed by the City., <br />Date request•received: <br />Conditional Use-PerAX t (other than. a PUD $75.00 plus $200 escrow .for review) paid: f= i <br />—Date Application Complete: 11/2018 conditional use pernut <br />
The URL can be used to link to this page
Your browser does not support the video tag.