<br />FEASIBILITY STUDY GEMLK 186534 <br />Page 2 <br />standards. Water quality data was reviewed using the City’s Consumer Confidence Reports <br />(CCRs), which are annual drinking water quality reports required by the U.S. Environmental <br />Protection Agency. <br />Vadnais Heights draws its water from three deep wells, 470–495 feet, tapping the Prairie Du <br />Chien–Jordan and Jordan aquifers, with an additional well available for emergency use. The <br />water is treated with chlorine for disinfection, fluoride for fluoridation, and polyphosphate to <br />control iron and manganese, helping to maintain taste and appearance. The water is not softened <br />and has a hardness of 12 grains per gallon, which is considered hard. <br />3.1 Little Fox Lane Connection <br />The proposed Little Fox Lane connection will be installed within the western ditch of Labore <br />Road, consisting of a 12-inch HDPE water main. (as shown in Figure 3) From there, an 8-inch <br />main will extend across Labore Road and continue along the south side of Little Fox Lane to <br />minimize impacts at the Little Fox Lane/Big Fox Road intersection. It will then cross Little Fox <br />Lane, proceed north along the west side of Big Fox Road, and terminate just north of the existing <br />cul-de-sac. The proposed watermain will be installed at a depth of 7.5’ deep and installed <br />approximately 4’ from the edge of the bituminous pavement to minimize roadway impacts. <br />3.2 Goose Lake Road Connection <br />The proposed Goose Lake Road connection will be installed within the southern ditch of Goose <br />Lake Road, the water will extend from the Labore Road future water main extension from The <br />City of Vadnais Heights. The Goose Lake Road extension will consist of a 10-inch HDPE water <br />main which will extend to the east approximately 3200’ (as shown in Figure 3). Two 6” lines will <br />serve isolated streets along the route. The first tee to 6” main will be located at the Tessier Road <br />intersection that will run along the east side of the roadway to its terminus at the end of the cul- <br />de-sac. The second tee will be installed at the Haven Lane intersection and will extend down the <br />east side of haven Lane to the end of the cul-de-sac. To minimize impacts, the proposed <br />watermain will be installed at a depth of 7.5’ deep and approximately 4’ from the edge of the <br />existing bituminous pavement. <br />3.3 Connection to the Vadnais Heights System <br />The City of Vadnais Heights has been in contact with the City of Gem Lake regarding the future <br />connection along Labore Rd. Based on the preliminary demand projections, they have the supply <br />and storage capacity to serve the Gem Lake water system. With the current connection at the <br />Gem Lake Villas, the City has experience with billing and any maintenance requirements. <br />The hydraulic analysis and computer modeling performed as part of the 2022 report indicated <br />that connection to the Vadnais Heights water system would produce adequate pressures and <br />flow rates in Gem Lake. The lowest household pressure seen was 35 PSI however most of the <br />homes were in the 60 PSI to 70 PSI range. If the pressure is too low in one of the households, a <br />booster pump can be installed when the home decides to connect to the system. This is within <br />the acceptable range for a water distribution system. <br />Vadnais Heights billing rates are established in the municipal ordinance related to the water <br />system (Chapter 36, Article II, Division 3) and are shown below from the 2025 Water Fee <br />Schedule. For larger connections, fees are noted in the ordinance to be determined by the City <br />Engineer based on the costs for installing the service.