Laserfiche WebLink
CITY OF GEM LAKE, MN <br />2007 FEE SCHEDULE <br />3) CITY SEWER AND WATER RELATED CHARGES <br />A) CITY SEWER CHARGES <br />Annual Residential Sewer User Charge <br />Annual Commercial Sewer User Charge <br />Annual Industrial Sewer User Charge <br />Metered Sanitary Sewer Charge <br />$ 172.00/SAC unit <br />($ 43.00 /quarter) <br />$ 172.00/SAC unit <br />$ 172.00/SAC unit <br />$ 1.72 per 1,000 gallons <br />NOTES: <br />1) Sewer use charges not paid within 30 days after the due date will be charged the <br />following service charges: <br />Residential $ 4.00 or 10% of the amount due in each billing period <br />Commercial/Industrial 10% if paid within one month after it is due, <br />Otherwise <br />After one month of arrears, 20% of the amount due in <br />each billing period <br />2) If 2 quarters of sewer charges have not been paid when due, or if over $ 100.00 of <br />sewer charges are overdue, then a penalty charge of $ 25.00 for up to $ 250.00 in <br />arrears or $ 50.00 for amounts greater than $ 250..00 will be added to the amounts <br />due. <br />City Sewer Availability Charge $ 650.00 <br />Sewer connection permit — new construction $ 200.00/SAC unit <br />Sewer changeover permit — from septic $ 250.00/system converted <br />Sewer re -inspection fee <br />Sewer contractor license <br />$ 65.00/hour <br />(minimum 1 hour) <br />$ 150.00 initial <br />$ 75.00 annual renewal <br />ISTS septic inspection (Done Bi-annually) $ 40.00 <br />ISTS re -inspection $ 65.00/hour <br />B) CITY WATER CHARGES <br />Water connection charge <br />Water use charge <br />Page 4 of 7 <br />$ 650.00 per dwelling unit <br />To be determined by City <br />Depends on distribution <br />system serving area of city <br />Final version 1/14/07 <br />Established by Resolution 2007-01 <br />