My WebLink
|
Help
|
About
|
Sign Out
Home
2007 12-10 CCP
GemLake
>
CITY COUNCIL
>
PACKETS
>
2000 - 2009
>
2007
>
2007 12-10 CCP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2026 1:35:57 PM
Creation date
6/1/2026 1:34:07 PM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKET
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
Show annotations
View images
View plain text
Emeott stated that there was money allocated in the 2008 budget to help the Planning Commission meet these <br />deadlines. <br />Mr. Lindner stated he will be attending the December Vadnais Heights planning commission meeting to apprise <br />them of the work Gem Lake is doing. Mayor Emeott will send a .pdf file from Putman to Lindner for this meeting. <br />Lindner will report on this topic at the next Gem Lake city council meeting. <br />Mr. Lindner stated that the comprehensive plan is something the City will need to live with the next 20-30 years. <br />However, while it can be amended as needed, it cannot be changed such that the Plan and zoning conflict. A <br />discussion about trail system throughout the city occurred next. In summary, the Planning Commission should look <br />at including some verbiage regarding the possibility of using current roads and abandoned rail road tracks to help <br />provide thoroughfares through the city and to interconnect Gem Lake with other neighboring cities. <br />Building Committee (City Hall) report (Craig Rafferty): The lighting is in, the tile is down, the carpet is <br />being laid today. The cleaning crew will be in shortly to begin the construction cleanup. The new City Hall will be <br />ready by January. HVAC work is going slow, and a punch list is being put together. Rafferty is anticipating a 5% <br />overrun of costs for the new building which he stated is very good. There are two heating and cooling zones in the <br />building to allow the conference room to be closed off until needed. <br />OLD BUSINESS <br />A) RFP (Request for Proposal) - City Audit process for next 4 years: Topic will be covered in New <br />Business, Item C. <br />B) City MS4 report for 2006 (Watson): Councilor Watson will schedule a time with Mayor Emeott to review <br />report. <br />NEW BUSINESS <br />A) Approval of payment of claims for November -December 2007: Mayor Emeott referred the Council to the <br />listing of payments requiring approval. Payment of claims for time period above was unanimously approved as <br />indicated by Councilor's signatures on this document. <br />B) SEH invoice for supervising sewer main repair — gas line in pipe: Mayor Emeott stated that Xcel is <br />balking at paying the SEH invoice for the engineering work done. SEH will contact Xcel and remind them that SEH <br />actually were there twice due to Xcel wanting to put off the work until the detouring of 35E/694 was completed and <br />that they could be billing for both times instead of only one. <br />C) Approval of RFP for Auditor for year end 2007: Mayor Emeott reported that Councilor Watson, Mayor <br />Emeott, and Gem Lake City Treasurer/White Bear Township Finance Director Jessie Hart met to review two RFPs. <br />One was submitted by Smith -Schaefer and a second by Larson- Allen. It is recommended that the Larson -Allen <br />proposal be accepted. Mayor Emeott reminded the Council that this type of audit is necessary in order to meet <br />current bonding requirements. Larson -Allen submitted a 5 year proposal for a complete financial audit which <br />Council Members received copies of. All of the costs are not to exceed costs <br />Motion by Schilling, Second Watson to accept the RFP 5 year proposal with not -to -exceed costs as listed. <br />Discussion continued around the fact that because Larson -Allen also does White Bear Township auditing, it is <br />expected that these costs will come in even lower than the costs. Also, the city has only a computer and phone as its <br />current assets so don't have to do much depreciation work. A vote was called by Mayor Emeott and the Resolution <br />to hire Larson -Allen was unanimously approved by voice vote. <br />D) Resolution 2007-16 to accept 2008 Gem Lake city budget and 2008 tax levy: Motion by Schilling, <br />Seconded by Watson to accept the 2008 Gem Lake City budget as presented was unanimously approved by voice <br />vote.Motion by Watson, Seconded by Schilling to accept the 2008 Gem Lake Tax Levy as presented was <br />unanimously approved by voice vote. Resident Uzpen asked how much residents should expect their taxes to <br />increase and was told about 9%. <br />Look for us on the World Wide Web at gemlakemn.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.