My WebLink
|
Help
|
About
|
Sign Out
Home
2026 06-16 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2026
>
2026 06-16 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2026 1:15:53 PM
Creation date
6/16/2026 1:15:29 PM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKET - CITY COUNCIL
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
Show annotations
View images
View plain text
Insituform Technologies USA, LLC <br /> 1140 Bunker Lake Blvd NW <br /> Anoka, MN 55303 <br /> Tel: 651.253.0236 <br /> <br /> ID#: SO-00224862 <br /> <br />Date: June 3, 2026 <br /> <br />To: General Contractors <br /> <br />From: Tony Ostgulen <br /> Business Development Manager <br /> 651.253.0236 <br /> <br />Project Name: Sanitary Sewer Clean and TV <br /> Gem Lake, MN Bid Date: June 5, 2026 <br /> <br />Insituform Technologies USA, LLC. herein proposes to furnish a Proposal for all labor, materials, equipment, and <br />services necessary to reconstruct the referenced project. <br />Assumptions and Qualifications <br />If conditions are materially different from those communicated to Insituform Technologies USA, LLC., we reserve <br />the right to void or renegotiate the pricing contained in this proposal. <br />Specific service connections will be reconnected only when written directions are received from the Owner/Prime <br />Contractor with an additional charge for each service connection. The Owner/Prime Contractor will indemnify and <br />hold Insituform Technologies USA, LLC. harmless from all claims arising from backups and other effects of such <br />actions or inactions from services not opened at the owner’s request . Water shall be provided at no cost to <br />Insituform Technologies USA, LLC. for all construction phases of this project. Insituform Technologies <br />USA, LLC. will follow all required deposit, backflow prevention, and metering procedures. <br />The Owner/Prime Contractor will provide access to both ends of the line, traffic control, and point repairs if needed. <br />Installation can be completed after point repairs and access to both ends are completed. <br /> <br />Proposal Pricing <br /> <br /> <br />1. There will be a charge for each additional mobilization , for cleaning, above the 1 anticipated mobilization. The <br />additional mobilization cost will be provided in a Change Order request and must be approved by the GC, in writing, <br />prior to additional mobilization. <br /> <br />2. We have the right to negotiate our price if quantities differ more than 10% from those stated in the proposal. <br /> <br />3. GC will be responsible for locating and exposing any buried manholes, if applicable. <br /> <br /> <br />Item Unit Est Qty Unit Price Amount <br />1 Mobilization LS 1 4,705.88$ 4,705.88$ <br />2 Cleaning and Televising LF 15168 3.69$ 55,969.92$ <br />3 Heavy Cleaning HR 0 700.00$ -$ <br />4 Protruding Tap Removal EA 0 300.00$ -$ <br />60,675.80$
The URL can be used to link to this page
Your browser does not support the video tag.