My WebLink
|
Help
|
About
|
Sign Out
Home
2026 06-16 CC Packet
GemLake
>
CITY COUNCIL
>
PACKETS
>
2020 - 2026
>
2026
>
2026 06-16 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2026 1:15:53 PM
Creation date
6/16/2026 1:15:29 PM
Metadata
Fields
Template:
Administration
Code
ADM 00500
Document
AGENDA PACKET - CITY COUNCIL
Destruction
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
Show annotations
View images
View plain text
Insituform Proposal – Gem Lake, MN – bid date 06 05 26 <br /> <br />2 | P a g e <br /> <br />4. Insituform submits this bid based on the plans and specifications furnished to it. Insituform’s bid is expressly <br />conditioned upon the negotiation of terms and conditions fair to Insituform. Insituform shall have no obligation to <br />perform and shall not be bound by its bid until the execution of a mutually agreeable written contract. <br /> <br /> <br />Proposal Inclusions <br /> <br />The prices stated in this proposal include: <br /> <br />1. Mobilization and demobilization. <br />2. Pipeline cleaning of normal deposits any conditions beyond ‘normal” will be treated as an extra <br />3. Video inspections and documentation of existing pipes. <br />4. Confined space safe entry practices. <br />5. Certificate of insurance with standard coverage <br /> <br />Proposal Exclusions <br /> <br />Not included in the prices stated in this estimate are costs associated with the items listed below. These items, if needed or <br />found to be applicable, would be provided by Insituform Technologies USA, LLC. at your additional cost; or would be <br />furnished by others, at your direction, at no cost to Insituform Technologies USA, LLC.: <br />a) Clear access to sewer through new or existing manhole, manhole frame and chimney/corbel removed if necessary. <br />b) If preliminary video inspection of the pipe interior indicates excessive damage, or other extra-ordinary condition, which <br />will require excavation, or other extraordinary remedy, to prepare the pipe for installation of the Insitutube, then those <br />services will be provided by the Prime contractor or Owner. This will include excessive roots, excessive debris and <br />protruding taps. <br />c) Additional cleaning and televising mobilizations and/or setups due to point repairs, obstruction removals, or delays out of <br />our control will be an additional charge. <br />d) Protruding tap removal unless specified <br />e) Water from fire hydrants within a convenient distance from each cleaning. <br />f) Legal dumpsite for debris resulting from pipe cleaning. <br />g) If any hazardous or toxic materials are encountered during the project, the Owner /Prime Contractor will be responsible <br />for the removal and disposal of the materials. <br />h) Project permits, special insurance, and/or local licenses. <br />i) Weekend/Holiday working hours. <br />j) State and local sales and/or use taxes on the value of the project. If you are exempt, please submit the appropriate <br />documentation. <br />k) Additional premiums for special insurance coverage(s) demanded by you or other parties particular to this project. <br />l) Performance and Payment Bond not included. This is available upon request, but if required please add 2.5% to the total <br />project cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.